Exam 5: Systems Analysis
Exam 1: The Context of Systems Analysis and Design Methods130 Questions
Exam 2: Information System Building Blocks81 Questions
Exam 3: Information Systems Development113 Questions
Exam 4: Project Management97 Questions
Exam 5: Systems Analysis161 Questions
Exam 6: Fact-Finding Techniques for Requirements Discovery166 Questions
Exam 7: Modeling System Requirements With Use Cases75 Questions
Exam 8: Data Modeling and Analysis173 Questions
Exam 9: Process Modeling231 Questions
Exam 10: Object-Oriented Analysis and Modeling Using the Uml125 Questions
Exam 11: Feasibility Analysis and the System Proposal149 Questions
Exam 12: Systems Design120 Questions
Exam 13: Application Architecture and Modeling170 Questions
Exam 14: Database Design268 Questions
Exam 15: Output Design and Prototyping101 Questions
Exam 16: Input Design and Prototyping148 Questions
Exam 17: User Interface Design75 Questions
Exam 18: Object-Oriented Design and Modeling Using the UML100 Questions
Exam 19: Systems Construction and Implementation60 Questions
Exam 20: Systems Operations and Support63 Questions
Select questions type
The final deliverable of the scope definition phase is a working prototype to demonstrate system requirements.
Free
(True/False)
4.8/5
(41)
Correct Answer:
False
Operational feasibility asks the following question(s):
Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
B
The final deliverable for the problem analysis phase is the completion of an updated project plan, including problem analyses, any system models, the system improvement objectives, and any other documentation that was produced during this phase.
Free
(True/False)
4.9/5
(43)
Correct Answer:
True
The application of systems analysis methods to the goal of dramatically changing and improving the fundamental business processes of an organization, independent of technology is:
(Multiple Choice)
4.9/5
(35)
A problem solving technique that reassembles a system's component pieces into a complete, new and improved system is:
(Multiple Choice)
4.8/5
(35)
In the scope definition phase, urgency is used to represent what time frame the problem needs to be solved or the opportunity or directive to be realized.
(True/False)
4.8/5
(29)
Model driven analysis emphasizes the development of application prototypes to quickly implement a new system without the need for requirements analysis.
(True/False)
4.8/5
(36)
BPR is often triggerd by total quality management and continuous process improvement.
(True/False)
4.9/5
(39)
_______________ is a technique that delivers the information system in multiple versions.
(Short Answer)
4.9/5
(32)
Rapid architecture analysis attempts to derive system models from existing systems or discovery prototypes.
(True/False)
4.9/5
(41)
Business process redesign is the application of systems analysis methods to the goal of dramatically changing and improving the fundamental business processes of an organization, independent of information technology.
(True/False)
4.9/5
(35)
_________________________________ is defined as those development phases in a project that primarily focus on the business problem, independent of any technology that can or will be used to implement a solution to that problem.
(Short Answer)
4.8/5
(30)
The _____________________________________ phase typically includes prioritizing system requirements.
(Short Answer)
4.7/5
(37)
__________________________________ is a problem-solving technique that decomposes a system into its component pieces for the purpose of studying how well those component parts work and interact to accomplish their purpose.
(Short Answer)
4.7/5
(31)
Data Flow Diagrams (DFDs) can only be used to depict proposed new processes in a system, along with their inputs, outputs and files.
(True/False)
4.8/5
(45)
A problem solving technique that decomposes a system into its component parts while focusing on the business problem independent of technology is:
(Multiple Choice)
4.7/5
(31)
_________________________________ approaches emphasize the construction of prototypes to more rapidly identify business and user requirements for a new system.
(Short Answer)
4.7/5
(52)
The final deliverable and milestone for the decision analysis phase is to produce a system proposal that will fulfill the business requirements identified in the previous phases.
(True/False)
4.8/5
(30)
A prototype is a small-scale, incomplete, but working sample of a desired system.
(True/False)
4.8/5
(50)
Showing 1 - 20 of 161
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)