Exam 19: Systems Construction and Implementation

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

A test to measure the throughput and response time under a normal processing workload is called a _____________________________ test.

(Short Answer)
4.9/5
(36)

Which kind of testing might be done by a quality assurance staff?

(Multiple Choice)
4.8/5
(27)

Installing the database is done during the systems _______________ phase.

(Short Answer)
4.7/5
(39)

Which of the following is NOT a task of the Systems Implementation phase?

(Multiple Choice)
4.8/5
(31)

___________________________ refers to the situation where both the old and new systems are both operated for some time period. This ensures that all major problems in the new system have been solved before the old system is discarded.

(Short Answer)
4.8/5
(35)

Systems construction is the development, installation, and testing of system components.

(True/False)
4.8/5
(37)

When the database to be built is a noncorporate, applications-oriented database, the systems analyst often completes the task of building and testing the database.

(True/False)
4.7/5
(36)

__________________________________ is a test whereby all the events and modules that have been coded and stub tested for a program are tested as an integrated unit; it is the testing of an entire program.

(Short Answer)
4.9/5
(37)

If the system involves writing software, it is done during the systems _______________ phase.

(Short Answer)
4.8/5
(42)

A test of the programming to implement an entire use case would be a(n):

(Multiple Choice)
4.8/5
(37)

A person who is a specialist in the design of local and wide area networks and their connectivity is called a(n):

(Multiple Choice)
4.9/5
(40)

A system acceptance test addresses which level(s) of acceptance testing?

(Multiple Choice)
4.9/5
(39)

The main input into the install and test new software activity are the new software packages and documentation that are received from system vendors.

(True/False)
4.7/5
(40)

Systems implementation is the installation and delivery of the entire system into production.

(True/False)
4.9/5
(33)

The first activity of the construction phase is to is build and test networks.

(True/False)
4.9/5
(33)

Building an unpopulated database is done during the systems _______________ phase.

(Short Answer)
4.8/5
(37)

_________________________ is the situation where the same system will be used in multiple geographic locations, that it is usually converted one location at a time using either abrupt or parallel conversion techniques at a location.

(Short Answer)
4.9/5
(34)

Which of the following systems conversion strategies involves operating the old and new system jointly over a period of time before a cutover to the new system is made?

(Multiple Choice)
4.9/5
(37)

Which installation strategy is the riskiest?

(Multiple Choice)
4.8/5
(34)

Which installation strategy converts the to the new system one version at a time?

(Multiple Choice)
4.9/5
(36)
Showing 41 - 60 of 60
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)