Exam 19: Systems Construction and Implementation
Exam 1: The Context of Systems Analysis and Design Methods130 Questions
Exam 2: Information System Building Blocks81 Questions
Exam 3: Information Systems Development113 Questions
Exam 4: Project Management97 Questions
Exam 5: Systems Analysis161 Questions
Exam 6: Fact-Finding Techniques for Requirements Discovery166 Questions
Exam 7: Modeling System Requirements With Use Cases75 Questions
Exam 8: Data Modeling and Analysis173 Questions
Exam 9: Process Modeling231 Questions
Exam 10: Object-Oriented Analysis and Modeling Using the Uml125 Questions
Exam 11: Feasibility Analysis and the System Proposal149 Questions
Exam 12: Systems Design120 Questions
Exam 13: Application Architecture and Modeling170 Questions
Exam 14: Database Design268 Questions
Exam 15: Output Design and Prototyping101 Questions
Exam 16: Input Design and Prototyping148 Questions
Exam 17: User Interface Design75 Questions
Exam 18: Object-Oriented Design and Modeling Using the UML100 Questions
Exam 19: Systems Construction and Implementation60 Questions
Exam 20: Systems Operations and Support63 Questions
Select questions type
A test to measure the throughput and response time under a normal processing workload is called a _____________________________ test.
(Short Answer)
4.9/5
(36)
Which kind of testing might be done by a quality assurance staff?
(Multiple Choice)
4.8/5
(27)
Installing the database is done during the systems _______________ phase.
(Short Answer)
4.7/5
(39)
Which of the following is NOT a task of the Systems Implementation phase?
(Multiple Choice)
4.8/5
(31)
___________________________ refers to the situation where both the old and new systems are both operated for some time period. This ensures that all major problems in the new system have been solved before the old system is discarded.
(Short Answer)
4.8/5
(35)
Systems construction is the development, installation, and testing of system components.
(True/False)
4.8/5
(37)
When the database to be built is a noncorporate, applications-oriented database, the systems analyst often completes the task of building and testing the database.
(True/False)
4.7/5
(36)
__________________________________ is a test whereby all the events and modules that have been coded and stub tested for a program are tested as an integrated unit; it is the testing of an entire program.
(Short Answer)
4.9/5
(37)
If the system involves writing software, it is done during the systems _______________ phase.
(Short Answer)
4.8/5
(42)
A test of the programming to implement an entire use case would be a(n):
(Multiple Choice)
4.8/5
(37)
A person who is a specialist in the design of local and wide area networks and their connectivity is called a(n):
(Multiple Choice)
4.9/5
(40)
A system acceptance test addresses which level(s) of acceptance testing?
(Multiple Choice)
4.9/5
(39)
The main input into the install and test new software activity are the new software packages and documentation that are received from system vendors.
(True/False)
4.7/5
(40)
Systems implementation is the installation and delivery of the entire system into production.
(True/False)
4.9/5
(33)
The first activity of the construction phase is to is build and test networks.
(True/False)
4.9/5
(33)
Building an unpopulated database is done during the systems _______________ phase.
(Short Answer)
4.8/5
(37)
_________________________ is the situation where the same system will be used in multiple geographic locations, that it is usually converted one location at a time using either abrupt or parallel conversion techniques at a location.
(Short Answer)
4.9/5
(34)
Which of the following systems conversion strategies involves operating the old and new system jointly over a period of time before a cutover to the new system is made?
(Multiple Choice)
4.9/5
(37)
Which installation strategy converts the to the new system one version at a time?
(Multiple Choice)
4.9/5
(36)
Showing 41 - 60 of 60
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)