Exam 9: Process Modeling
Exam 1: The Context of Systems Analysis and Design Methods130 Questions
Exam 2: Information System Building Blocks81 Questions
Exam 3: Information Systems Development113 Questions
Exam 4: Project Management97 Questions
Exam 5: Systems Analysis161 Questions
Exam 6: Fact-Finding Techniques for Requirements Discovery166 Questions
Exam 7: Modeling System Requirements With Use Cases75 Questions
Exam 8: Data Modeling and Analysis173 Questions
Exam 9: Process Modeling231 Questions
Exam 10: Object-Oriented Analysis and Modeling Using the Uml125 Questions
Exam 11: Feasibility Analysis and the System Proposal149 Questions
Exam 12: Systems Design120 Questions
Exam 13: Application Architecture and Modeling170 Questions
Exam 14: Database Design268 Questions
Exam 15: Output Design and Prototyping101 Questions
Exam 16: Input Design and Prototyping148 Questions
Exam 17: User Interface Design75 Questions
Exam 18: Object-Oriented Design and Modeling Using the UML100 Questions
Exam 19: Systems Construction and Implementation60 Questions
Exam 20: Systems Operations and Support63 Questions
Select questions type
_______________________ events trigger processes based on a system's change from one state or condition to another.
(Short Answer)
4.9/5
(32)
The use of logical models reduces the risk of missing business requirements.
(True/False)
4.7/5
(33)
_________________________ events trigger processes on the basis of time.
(Short Answer)
4.9/5
(38)
_______________________________ diagrams are constructed for those event processes that require additional processing details. These data flow diagrams include all the elementary processes, data stores and data flows for single events.
(Short Answer)
5.0/5
(36)
Examples of _________________ include END OF MONTH, and 30 DAYS LATE.
(Short Answer)
4.8/5
(46)
A data attribute is the smallest piece of data that has meaning to the end users and the business.
(True/False)
4.9/5
(38)
A tabular form of presentation that specifies a set of conditions and their corresponding actions is:
(Multiple Choice)
4.9/5
(40)
An event response list is compiled to partition the system into logical subsystems and/or functions.
(True/False)
4.8/5
(33)
Data conservation requires that a data flow contain the entire data entity with all its attributes that is requested by a process.
(True/False)
4.9/5
(40)
Data flow diagrams have found new use in business process redesign.
(True/False)
4.8/5
(37)
Balancing is the synchronizing of data flow diagrams at different levels of detail to preserve consistency and completeness of the models.
(True/False)
4.9/5
(30)
A data flow represents an input of data to a process or the output of data from a process.
(True/False)
4.8/5
(36)
A(n) ________________________________ is compiled to identify and confirm the business events to which the system must provide a response.
(Short Answer)
4.8/5
(39)
Another name for the data flow diagram is an entity relationship diagram.
(True/False)
5.0/5
(32)
Primitive processes are the lowest level of detail when depicted in a process model.
(True/False)
4.8/5
(32)
A technique for organizing and documenting the structure and flow of data through a system's processes and or the logic, policies and procedures to be implemented by a system's processes is known as:
(Multiple Choice)
4.9/5
(36)
A decomposition diagram is a tool that depicts the flow of data through a system and the work or processing performed by that system.
(True/False)
4.8/5
(39)
A policy is a set of rules that governs some process in the business.
(True/False)
4.7/5
(47)
In a data flow diagram, squares are used to represent external agents - the boundary of the system.
(True/False)
4.8/5
(40)
Showing 141 - 160 of 231
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)