Exam 6: Fact-Finding Techniques for Requirements Discovery
Exam 1: The Context of Systems Analysis and Design Methods130 Questions
Exam 2: Information System Building Blocks81 Questions
Exam 3: Information Systems Development113 Questions
Exam 4: Project Management97 Questions
Exam 5: Systems Analysis161 Questions
Exam 6: Fact-Finding Techniques for Requirements Discovery166 Questions
Exam 7: Modeling System Requirements With Use Cases75 Questions
Exam 8: Data Modeling and Analysis173 Questions
Exam 9: Process Modeling231 Questions
Exam 10: Object-Oriented Analysis and Modeling Using the Uml125 Questions
Exam 11: Feasibility Analysis and the System Proposal149 Questions
Exam 12: Systems Design120 Questions
Exam 13: Application Architecture and Modeling170 Questions
Exam 14: Database Design268 Questions
Exam 15: Output Design and Prototyping101 Questions
Exam 16: Input Design and Prototyping148 Questions
Exam 17: User Interface Design75 Questions
Exam 18: Object-Oriented Design and Modeling Using the UML100 Questions
Exam 19: Systems Construction and Implementation60 Questions
Exam 20: Systems Operations and Support63 Questions
Select questions type
Requirements validation checks the requirements definition document for accuracy, completeness, consistency, and conformance to standards.
(True/False)
4.9/5
(39)
_________________ is a fact-finding technique that brings stakeholders together for a group meeting.
(Short Answer)
4.9/5
(38)
An advantage of observation is that it is relatively inexpensive compared to other fact-finding techniques.
(True/False)
4.9/5
(32)
____________________________ is a fact-finding technique that suffers from a low response rate.
(Short Answer)
4.9/5
(36)
A(n) ____________________________________________ specifies a property or characteristic of a system.
(Short Answer)
4.7/5
(26)
Which of the following is NOT a guideline for successfully conducting a JRP session?
(Multiple Choice)
4.9/5
(38)
A disadvantage of interviewing is that it may be impractical due to the location of the interviewees.
(True/False)
4.9/5
(41)
_______________________ requirements are ones that are stated correctly.
(Short Answer)
4.7/5
(27)
Which of the following might happen if system requirements are incorrect?
(Multiple Choice)
4.7/5
(40)
Some of the initial requirements gathered from stakeholders may be:
(Multiple Choice)
4.9/5
(33)
A disadvantage of JRP is that it actively isolates users and management during the development project.
(True/False)
4.9/5
(37)
Which of the following is NOT one of the seven common fact-finding techniques?
(Multiple Choice)
4.9/5
(39)
An advantage of discovery prototyping is that it may minimize the time spent for fact-finding and help define more stable and reliable requirements.
(True/False)
4.9/5
(33)
A(n) ___________________________ (advantage or disadvantage) of a questionnaire is that the analyst cannot observe and analyze the body language of the respondent.
(Short Answer)
4.8/5
(38)
When JRP incorporates prototyping as a means of confirming requirements and obtaining design approvals, the benefits of prototyping are also realized.
(True/False)
4.7/5
(41)
A disadvantage of a questionnaire is that the analyst cannot observe and analyze the body language of the respondent.
(True/False)
4.9/5
(32)
Randomization is a sampling technique characterized as having no predetermined pattern or plan for selecting sample data.
(True/False)
4.9/5
(42)
The Ishikawa diagram is often referred to as a cause-and-effect diagram or a fishbone diagram.
(True/False)
4.8/5
(35)
An advantage of prototyping is that it tends to lead to realistic expectations for the system on the part of users.
(True/False)
4.8/5
(39)
Showing 21 - 40 of 166
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)