Exam 5: Scheduling the Project
Exam 1: The World of Project Management70 Questions
Exam 2: The Manager, the Organization, and the Team68 Questions
Exam 3: Planning the Project63 Questions
Exam 4: Budgeting the Project64 Questions
Exam 5: Scheduling the Project63 Questions
Exam 6: Allocating Resources to the Project66 Questions
Exam 7: Monitoring and Controlling the Project72 Questions
Exam 8: Evaluating and Terminating the Project67 Questions
Select questions type
An identifiable state resulting from the completion of one or more activities is called?
Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
A
A disadvantage of using beta distribution to approximate activity times is that it is generally less flexible than the normal distribution.
Free
(True/False)
4.8/5
(35)
Correct Answer:
False
Standard Pert/CPM networks can be use to resolve probabilistic concerns.
(True/False)
4.9/5
(41)
What is the expected time to complete a task with an optimistic, most likely, and pessimistic times of 3, 4, and 7 days respectively?
(Multiple Choice)
4.7/5
(31)
Technical dependencies are often harder to see on a Gantt chart than on a PERT/CPM network.
(True/False)
4.8/5
(30)
The formula for the expected time of an activity in a network assumes that the optimistic, pessimistic, and most likely time estimates have a Beta distribution.
(True/False)
4.8/5
(36)
Which of the following is typically used as the best estimate of task duration?
(Multiple Choice)
4.9/5
(39)
What are the four methods of linking steps in a project using precedence diagramming?
(Not Answered)
This question doesn't have any answer yet
A start-to-finish linkage is the most common way of linking to successive task.
(True/False)
4.8/5
(29)
Which of the following terms is most closely associated with a task required by the project?
(Multiple Choice)
4.9/5
(29)
The simulation approach is generally preferred over the statistical method.
(True/False)
4.7/5
(45)
Showing 1 - 20 of 63
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)