Exam 5: The Project in the Organizational Structure
Exam 1: Projects in Contemporary Organizations41 Questions
Exam 5: The Project in the Organizational Structure49 Questions
Exam 2: Strategic Management and Project Selection39 Questions
Exam 3: The Project Manager44 Questions
Exam 4: Negotiation and the Management of Conflict44 Questions
Exam 6: Project Activity Planning39 Questions
Exam 7: Budgeting and Cost Estimation40 Questions
Exam 8: Scheduling50 Questions
Exam 9: Resource Allocation46 Questions
Exam 10: Monitoring and Information Systems53 Questions
Exam 11: Project Control41 Questions
Exam 12: Project Auditing52 Questions
Select questions type
When the major focus of a project must be on the in-depth application of a technology rather than on minimizing cost, meeting a specific schedule or achieving speedy response to change, the __________ organizational form is apt to be the form of choice.
(Short Answer)
4.8/5
(32)
The __________ manager is typically responsible for a number of related projects, each with its own project manager.
(Short Answer)
4.8/5
(30)
A major contribution of __________ is to establish project administration procedures for selecting, initializing and planning, budgeting, and scheduling projects as well as to serve as a repository for reports on the performance of the planning, budgeting, scheduling, and resource allocation processes.
(Multiple Choice)
4.8/5
(44)
The project management office is often created by organizations to __________.
(Multiple Choice)
4.8/5
(34)
__________ is the term that describes the optimization of a subelement of a system, perhaps to the detriment of the overall system.
(Short Answer)
4.8/5
(40)
__________ is defined as inappropriately intense loyalty to the project.
(Short Answer)
4.9/5
(42)
When a project requires the integration of inputs from several functional areas and involves reasonably sophisticated technology, but does not require all the technical specialists to work for the project on a full-time basis, the __________ organizational form should be used.
(Multiple Choice)
4.8/5
(31)
Project priorities are more of a concern in the __________ stages of the project life cycle.
(Multiple Choice)
4.8/5
(39)
The firm or organization within which the project is being conducted is known as the __________.
(Short Answer)
4.9/5
(32)
A characteristic of __________ projects is that the work these projects can cross time, space, organizational, and cultural boundaries.
(Multiple Choice)
4.8/5
(35)
The __________ matrix is most similar to the resembles the projectized organizational form.
(Short Answer)
4.7/5
(41)
Identify the major reasons for the rapid growth of project-oriented organizations.
(Essay)
4.9/5
(31)
The process of dealing with uncertainties in projects has come to be known as __________.
(Multiple Choice)
5.0/5
(35)
Identify the statement that is NOT a major advantage of placing a project in the matrix approach.
(Multiple Choice)
4.8/5
(27)
Identify the statement that is NOT a major advantage of placing a project within a functional element of the parent organization.
(Multiple Choice)
4.8/5
(35)
This member of the project team is responsible for the efficient production of the product of the process, including the manufacturing engineering, design and production of tooling, production scheduling, and other production tasks.
(Multiple Choice)
4.9/5
(33)
Subletting tasks out to smaller contractors is known as __________.
(Short Answer)
4.8/5
(35)
The underlying principle of modern organizations is __________ of the human elements in the group.
(Short Answer)
4.7/5
(34)
Showing 21 - 40 of 49
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)