A majority of uncertainty has its source in systems that lie outside the project, in its __________.

(Short Answer)
4.8/5
(28)

In their 2005 paper Hussain and Wearne reported the results of a survey of over 1000 project managers who were asked to identify the "greatest problem of project management". Which of the following was NOT one of the top three responses?

(Multiple Choice)
5.0/5
(42)

__________ controls are usually viewed as helpful rather than as a source of unwelcome pressure if the controlees perceive themselves as able to perform inside the prescribed limits.

(Short Answer)
4.8/5
(30)

With respect to financial controls, courts will require the practice of __________ regarding financial controls, practices, and record-keeping.

(Short Answer)
4.9/5
(29)

Postproject controls or reviews are examples of __________.

(Short Answer)
4.7/5
(35)

Because project milestones do not occur at periodic intervals, go/no-go controls should be linked to the __________; not simply to the calendar.

(Multiple Choice)
4.9/5
(30)

A person with organizational clout who takes on personal responsibility for the successful completion of a project for the organization is referred to as a(n)__________.

(Multiple Choice)
4.9/5
(36)

Control is focused on three elements of a project. They are __________.

(Multiple Choice)
4.7/5
(30)

The most common type of control system is the __________, or steering control.

(Short Answer)
4.8/5
(28)

Identify some of the factors that can cause a project to require control of performance.

(Essay)
4.9/5
(30)

Identify some of the factors that can cause a project to require control of time.

(Essay)
4.8/5
(41)

__________ are seen as much the same as a report card.

(Short Answer)
4.8/5
(45)

In addition to being easy to maintain, a good control system will __________ if it goes out of order.

(Multiple Choice)
4.8/5
(33)

What are the two fundamental objectives of control?

(Essay)
4.8/5
(33)

In order to gain user acceptance, the control system should appear to be __________.

(Multiple Choice)
4.8/5
(37)

In a cybernetic control system using a negative feedback loop, the speed or force with which the control operates is, in general, __________ to the size of the deviation from standard.

(Multiple Choice)
4.8/5
(33)

Physical asset control is concerned with asset maintenance, whether __________.

(Multiple Choice)
4.9/5
(31)

Which of the following is the key feature of cybernetic control systems?

(Multiple Choice)
4.9/5
(35)

Most control systems used in project management today fall into this category of control system.

(Multiple Choice)
4.9/5
(31)

A(n) __________ measures performance over time, showing how it changes compared to a desired mean and upper and lower limits.

(Multiple Choice)
4.8/5
(40)