Exam 6: Process Analysis and Redesign
Exam 1: Product Line Planning and the Systems Approach114 Questions
Exam 2: Productivity and Strategic Planning115 Questions
Exam 3: Demand Creation and Predictive Planning114 Questions
Exam 4: Understanding Quality: ITS Management and Strategic Importance114 Questions
Exam 5: Process Configuration Strategies111 Questions
Exam 6: Process Analysis and Redesign115 Questions
Exam 7: Quality Assurance115 Questions
Exam 8: Management of Technology Mot101 Questions
Exam 9: Teamwork Planning Requires Job Design113 Questions
Exam 10: Supply Chain Capacity Planning113 Questions
Exam 11: Facilities Planning: Location and Layout112 Questions
Exam 12: Materials Management Impacts All Supply Chain Participants110 Questions
Exam 13: Aggregate Planning to Balance Supply and Demand106 Questions
Exam 14: Inventory Management for Smooth and Continuous Demand Patterns114 Questions
Exam 15: Material Requirements Planning Mrp for Sporadic Demand Patterns116 Questions
Exam 16: Production Scheduling for Manufacturing and Service Operations116 Questions
Exam 17: Cycle-Time Management Increases Productivity117 Questions
Exam 18: Project Management for New Products and Processes110 Questions
Exam 19: Change Management With Faster Project Completions103 Questions
Exam 20: Sustainability Issues: Environment, Ethics, and Security111 Questions
Select questions type
The _____ system for cutting changeover items is based on the recognition that there are setup steps that can be done without shutting the machine down.
(Multiple Choice)
4.7/5
(36)
A cutting tool has a lifetime that is normally distributed with an average life of 400 hours and a standard deviation of 50 hours.Present policy is preventive maintenance which requires changing all cutting tools at the end of each month.Current operations are two shifts per day and 7 working hours per shift.At 20 days per month,each cutting tool is in use 280 hours per month.(All cutting tools that fail are simply shut down until the end of the month sweep).The variable costs of replacement under the current policy are $8 per tool plus installation labor of $6 per tool.There are 40 tools in use.
-With 40 tools in use,how many are likely to fail during a month?
(Essay)
5.0/5
(40)
Productivity improvement programs and studies (PIPS) can be used to _____.
(Multiple Choice)
4.9/5
(34)
Strategic thinking for P/OM is related to altering the competitive situation by means of operating plans and decisions.
(True/False)
4.8/5
(36)
Bar codes and _____ are popular ways of identifying material location information.
(Multiple Choice)
4.8/5
(37)
_____ provides a means for visualizing the effectiveness with which workers operate their machines over time.
(Multiple Choice)
4.9/5
(39)
_____ charts can be used to achieve an optimal layout for the factory floor,warehouse,or office.
(Multiple Choice)
4.8/5
(35)
The seven points to consider for process flow design include considering that product quality is not a direct function of process flow design.
(True/False)
4.9/5
(38)
_____ the detailed study of activities required to make the product or deliver the service.
(Multiple Choice)
4.8/5
(38)
The process can be viewed as a total flow system.The activities that make up the flow are called the
(Multiple Choice)
4.8/5
(39)
It is possible to find equipment that can run one job while workers are changing the setup to run a different job in the SMED approach.
(True/False)
4.7/5
(42)
_____ is defined as a rational blend of maintenance alternatives.
(Multiple Choice)
4.7/5
(29)
Customers prefer to choose products that maximize value where value is a function of
(Multiple Choice)
4.9/5
(46)