Exam 2: Analyzing the Business Case
Exam 1: Introduction to Systems Analysis and Design80 Questions
Exam 2: Analyzing the Business Case81 Questions
Exam 3: Managing Systems Projects78 Questions
Exam 4: Requirements Modeling98 Questions
Exam 5: Data and Process Modeling84 Questions
Exam 6: Object Modeling78 Questions
Exam 7: Development Strategies82 Questions
Exam 8: User Interface Design82 Questions
Exam 9: Data Design86 Questions
Exam 10: System Architecture78 Questions
Exam 11: Managing Systems Implementation81 Questions
Exam 12: Managing Systems Support and Security81 Questions
Exam 13: Toolkit A: The Systems Analysts Toolkit45 Questions
Exam 14: Toolkit B: Case Tools44 Questions
Exam 15: Toolkit C: Financial Analysis Tools45 Questions
Exam 16: Toolkit D: Internet Resource Tools44 Questions
Select questions type
Matching
Identify the letters of the choices that best match the sentences or definitions.
-Its end product is a report to management.
(Multiple Choice)
4.8/5
(40)
A strategic plan that stresses technology tends to create an unfavorable climate for IT projects that extends throughout an organization.
(True/False)
5.0/5
(32)
_____ are advantages that are difficult to measure in dollars but are important to a company.
(Multiple Choice)
4.8/5
(34)
A systems analyst conducts a preliminary investigation to study the _____ and recommend specific action.
(Multiple Choice)
4.8/5
(24)
The _____, named after a nineteenth-century economist, is a widely used tool for visualizing issues that need attention and is drawn as a vertical bar graph.
(Multiple Choice)
4.9/5
(25)
When assessing schedule feasibility, a systems analyst must consider the interaction between time and costs.
(True/False)
4.8/5
(33)
Determining the _____ means defining the specific boundaries, or extent, of a project.
(Multiple Choice)
4.7/5
(21)
Internal and external factors affect every business decision that a company makes, and IT systems are no exception.
(True/False)
4.8/5
(37)
Matching
Identify the letters of the choices that best match the sentences or definitions.
-It is a system that provides the right products at the right place at the right time.
(Multiple Choice)
4.9/5
(32)
Which of the following is an example of an intangible benefit?
(Multiple Choice)
4.9/5
(36)
Matching
Identify the letters of the choices that best match the sentences or definitions.
-It typically starts with a systems request, followed by a preliminary investigation, which includes a feasibility study.
(Multiple Choice)
4.9/5
(37)
Matching
Identify the letters of the choices that best match the sentences or definitions.
-It is a technology that is expected to overshadow bar code technology in the future.
(Multiple Choice)
5.0/5
(35)
The objective of _____ is to gather data about project usability, costs, benefits, and schedules.
(Multiple Choice)
4.9/5
(38)
Electronic data interchange (EDI) enables _____ inventory systems, which rely on computer-to-computer data exchange to minimize unnecessary inventory.
(Multiple Choice)
4.7/5
(32)
Projects with very general scope definitions are at risk of expanding gradually, without specific authorization, in a process called _____.
(Multiple Choice)
5.0/5
(33)
A _____ is a requirement or condition that a system must satisfy or an outcome that a system must achieve.
(Multiple Choice)
4.8/5
(37)
Economic activity has a negligible influence on corporate information management.
(True/False)
4.8/5
(32)
Showing 21 - 40 of 81
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)