Exam 19: Linear Programming
Exam 1: Introduction to Operations Management70 Questions
Exam 2: Competitiveness, Strategy, and Productivity73 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design77 Questions
Exam 5: Strategic Capacity Planning for Products and Services103 Questions
Exam 6: Process Selection and Facility Layout151 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 11: Aggregate Planning and Master Scheduling81 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management162 Questions
Exam 14: Jit and Lean Operations88 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming105 Questions
Exam 20: Extension 4: Reliability10 Questions
Exam 21: Extension 5: Decision Theory126 Questions
Exam 22: Extension 7: Learning Curves68 Questions
Exam 23: Extension 8: The Transportation Model20 Questions
Exam 24: Extension 10: Acceptance Sampling65 Questions
Exam 25: Extension 14: Maintenance38 Questions
Select questions type
For the production combination of 600 bagels and 800 croissants, which resource is "slack" (not fully used)?
(Multiple Choice)
4.9/5
(30)
Which of the following is not a feasible purchase combination?
(Multiple Choice)
4.8/5
(31)
If a single optimal solution exists to a graphical LP problem, it will exist at a corner point.
(True/False)
4.8/5
(35)
A small firm makes three products, which all follow the same three step process, which consists of milling, inspection, and drilling.Product A requires 6 minutes of milling, 5 minutes of inspection, and 4 minutes of drilling; product B requires 2.5 minutes of milling, 2 minutes of inspection, and 2 minutes of drilling; and product C requires 5 minutes of milling, 4 minutes of inspection, and 8 minutes of drilling.The department has 20 hours available during the next period for milling, 15 hours for inspection, and 24 hours for drilling.Product A contributes $6.00 per unit to profit, product B contributes $4.00 per unit, and product C contributes $10.00 per unit.
Use the following computer output to find the optimum mix of products in terms of maximizing contributions to profits for the next period.
PROBLEM TITLE: LINEAR PROGRAMMING
PROBLEM IS A MAX WITH 3 VARIABLES AND 3 CONSTRAINTS.




(Essay)
4.8/5
(36)
Which of the following is not a component of the structure of a linear programming model?
(Multiple Choice)
4.8/5
(35)
A manager must decide on the mix of products to produce for the coming week.Product A requires three minutes per unit for molding, two minutes per unit for painting, and one minute per unit for packing.Product B requires two minutes per unit for molding, four minutes per unit for painting, and three minutes per unit for packing.There will be 600 minutes available for molding, 600 minutes for painting, and 420 minutes for packing.Both products have profits of $1.50 per unit.
(A) What combination of A and B will maximize profit?
(B) What is the maximum possible profit?
(C) How much of each resource will be unused for your solution?
(Essay)
4.8/5
(36)
Coordinates of all corner points are substituted into the objective function when we use the approach called:
(Multiple Choice)
4.9/5
(33)
For the production combination of 1,400 A-100's and 900 B-200's which resource is "slack" (not fully used)?
(Multiple Choice)
4.7/5
(28)
For the production combination of 0 American and 400 British, which resource is "slack" (not fully used)?
(Multiple Choice)
4.7/5
(31)
Non-zero slack or surplus is associated with a binding constraint.
(True/False)
4.7/5
(34)