Exam 12: MRP and ERP

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following represents an attempt to balance the benefits of stability against the benefits of responding to new information?

Free
(Multiple Choice)
4.9/5
(33)
Correct Answer:
Verified

D

A regenerative MRP system is one that is updated continuously - every time there is a schedule change.

Free
(True/False)
4.9/5
(35)
Correct Answer:
Verified

False

What is the net requirement for Dark Chocolate Truffles to fill this order?

Free
(Multiple Choice)
4.9/5
(37)
Correct Answer:
Verified

C

The gross requirements value for any given component is equal to the net requirements of that component's immediate parent multiplied by the quantity per parent.

(True/False)
4.8/5
(32)

The term pegging refers to identifying the parent items that have generated a given set of material requirements for a part or subassembly.

(True/False)
4.9/5
(37)

MRP really doesn't apply to services since raw material isn't required.

(True/False)
4.7/5
(27)

Lumpy demand for components results primarily from the periodic scheduling of batch production.

(True/False)
4.8/5
(39)

Back flushing takes place after the production has been completed.

(True/False)
4.9/5
(40)

Which one of the following most closely describes net material requirements?

(Multiple Choice)
4.8/5
(41)

A net-change MRP system is one that is updated periodically but not less frequently than once a week.

(True/False)
4.9/5
(31)

The identification of parent items is called:

(Multiple Choice)
4.7/5
(33)

If 17 Ps are needed, and no on-hand inventory exists for any items, how many Cs will be needed?

(Multiple Choice)
4.8/5
(37)

Which of the following is not usually necessary in order to have an effective MRP system?

(Multiple Choice)
4.8/5
(40)

Given the following data, construct a material requirements plan which will result in 100 units of Parent #1 (P1) at the beginning of week 6, and 200 units of Parent #2 (P2) at the beginning of week 8: B.

(Essay)
4.7/5
(28)

ERP implementation requires support and a direct mandate from the CEO because it impacts so many different functional areas.

(True/False)
4.9/5
(36)

How many Dark Chocolate Eggs should be ordered?

(Multiple Choice)
4.7/5
(32)

MRP II did not replace or improve the basic MRP.

(True/False)
4.9/5
(26)

In MRP, under lot-for-lot ordering, "planned-order receipts" are:

(Multiple Choice)
5.0/5
(38)

MRP output reports are divided into two main groups - daily and weekly.

(True/False)
4.8/5
(29)

Net requirements for component J are as follows: 60 units in week 2, 40 units in week 3, and 60 units in week 5.If a fixed-period, two-period lot-sizing method is used, what will be the quantity of the first planned receipt?

(Multiple Choice)
4.9/5
(37)
Showing 1 - 20 of 89