Exam 7: Dependent Demand Inventory
Exam 1: Operations and Supply Chain Strategy74 Questions
Exam 2: Quality Management75 Questions
Exam 3: New Product Development75 Questions
Exam 4: Process Design and Analysis75 Questions
Exam 5: Forecasting75 Questions
Exam 6: Independent Demand Inventory75 Questions
Exam 7: Dependent Demand Inventory74 Questions
Exam 8: Project Management75 Questions
Exam 9: Optimization and Simulation Modeling75 Questions
Exam 10: Capacity Planning75 Questions
Exam 11: Quality Improvement Methods75 Questions
Exam 12: Lean Enterprise75 Questions
Exam 13: Technology and Integrated Supply Management75 Questions
Exam 14: Global Supply Chain and Service Integration75 Questions
Select questions type
Planned receipts are future orders that have not yet been released but are planned in order to avoid a shortage or backlog of inventory.
(True/False)
4.8/5
(38)
A bill of materials database is a basic output of an MRP system.
(True/False)
4.9/5
(42)
A product structure tree is often used to visually represent the.
(Multiple Choice)
4.9/5
(33)
The report for a work center that projects already scheduled and expected future capacity requirements against capacity availability is called.
(Multiple Choice)
4.8/5
(36)
Fixed order quantity lot size has a variable order size based on lead time.
(True/False)
4.9/5
(49)
Periodic order quantities are designed to order exactly the amount required for a specified period of time.
(True/False)
4.9/5
(28)
____ represent/represents orders that have been placed but not yet received or completed.
(Multiple Choice)
4.8/5
(32)
Scheduled receipts are the total number of units of a part derived from all parent production plans.
(True/False)
4.8/5
(37)
If 4000 six-pack colas are required,and 2000 six-packs are on hand,how many individual cans should be ordered if 3000 individual cans are also on hand?
(Essay)
4.8/5
(38)
An MRP system is static,that is,once a plan is created,it is seldom modified.
(True/False)
4.9/5
(41)
Every finished product has a bill of materials that specifies all components required to produce one unit of the finished product.
(True/False)
4.9/5
(34)
Recording inventory transactions accurately and promptly is a critical component of an effective MRP system.
(True/False)
4.8/5
(41)
A time bucket is the period in the future that is being planned.
(True/False)
4.8/5
(36)
Small changes to the bill of materials are normally not critical to the MRP system and have little impact on the final output.
(True/False)
4.8/5
(36)
Safety stock is excess inventory that a company holds to guard against uncertainty in demand,lead time,and supply.
(True/False)
4.8/5
(38)
Give three options a manager can take when a load report is generated which shows that more capacity is required than is available.
(Essay)
4.9/5
(34)
Provide three factors that may influence the lot size decision for a fixed order quantity.
(Essay)
4.8/5
(27)
Lead time is the estimate of the time between releasing an order and receiving the order,and is always known with certainty.
(True/False)
5.0/5
(39)
Showing 41 - 60 of 74
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)