Exam 7: Scheduling Activities

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A successor activity follows a predecessor activity based on their logical relationship.

Free
(True/False)
4.7/5
(43)
Correct Answer:
Verified

True

  Figure 7-4 Lab Experiment Project -Consider the Lab Experiment Project depicted in Figure 7-4.Based on the information provided,how many days can you delay the calibration of the instrumentation (Activity B),without impacting the expected project completion date? Figure 7-4 Lab Experiment Project -Consider the Lab Experiment Project depicted in Figure 7-4.Based on the information provided,how many days can you delay the calibration of the instrumentation (Activity B),without impacting the expected project completion date?

Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
Verified

A

Monte Carlo simulation is a process which generates hundreds of thousands of probable performance outcomes based on probability distributions for cost and schedule on individual tasks.

Free
(True/False)
5.0/5
(44)
Correct Answer:
Verified

True

There is often terrific pressure to complete a project as quickly as possible.To confront this pressure,a project manager should quickly promise to meet the deadlines requested by the sponsor and then assemble a team to create the corresponding schedule.

(True/False)
4.9/5
(33)

All of the following strategies can help a project team to develop realistic time estimates for project activities EXCEPT:

(Multiple Choice)
4.8/5
(34)

Describe how you would use the members of your project team to develop and execute a project schedule.

(Essay)
4.8/5
(39)

While the lowest level of decomposition in a Work Breakdown Structure is the work package,work packages can still be decomposed further into project activities.

(True/False)
4.9/5
(30)

The most common type of logical dependency to determine the sequence of project activities is "finish-to-finish".

(True/False)
4.9/5
(36)

Faced with significant schedule challenges,the project manager has several responsibilities.All of the following are among the project manager's responsibilities EXCEPT:

(Multiple Choice)
4.9/5
(38)

Which of the following statements correctly describes the critical path?

(Multiple Choice)
4.7/5
(37)

GANTT refers to the Generalized Activity Network Tracking Technique which was developed to better understand how variability in the duration of individual activities impacts the expected project duration.

(True/False)
4.9/5
(35)

The primary advantage of PERT is that it removes uncertainty from the estimates of activity durations,thereby increasing confidence in the reliability of a project schedule.

(True/False)
4.9/5
(29)

The total number of work periods (not including holidays or other non-work periods)required to complete a schedule activity is known as:

(Multiple Choice)
4.9/5
(40)

Figure 7-2 Research Project -Consider the Research Project depicted in Figure 7-2.Based on the information provided,what is the slack associated with activity C - "Review Reports"?

(Multiple Choice)
4.9/5
(32)

  Figure 7-6 Network Scheduling Data -Consider the network scheduling data provided in Figure 7-6.What is the expected duration of this project? Figure 7-6 Network Scheduling Data -Consider the network scheduling data provided in Figure 7-6.What is the expected duration of this project?

(Multiple Choice)
4.8/5
(36)

Which of the following remedies may reduce the likelihood of omissions when developing activity duration estimates?

(Multiple Choice)
4.8/5
(45)

When developing a project schedule,total float (or slack)refers to the amount of time a schedule activity may be delayed from its early start date without delaying the project finish date.

(True/False)
4.8/5
(34)

Figure 7-3 System Integration Project Figure 7-3 System Integration Project    -Consider the System Integration Project depicted in Figure 7-3.Based on the information provided,how many days can you delay the purchase of software (Activity C),without impacting the expected project completion date? -Consider the System Integration Project depicted in Figure 7-3.Based on the information provided,how many days can you delay the purchase of software (Activity C),without impacting the expected project completion date?

(Multiple Choice)
4.8/5
(38)

Figure 7-1 Assembly Project -Consider the Assembly Project depicted in Figure 7-1.Based on the information provided,what is the early start date for activity D - "Attach Modules 1 & 2"?

(Multiple Choice)
4.9/5
(39)

All of the following problems contribute to difficulty in estimating activity durations accurately EXCEPT:

(Multiple Choice)
4.8/5
(43)
Showing 1 - 20 of 56