Exam 6: Defining Scope and Constructing Work Breakdown Structures WBS
Exam 1: Introduction to Project Management49 Questions
Exam 2: Project Selection and Prioritization52 Questions
Exam 3: Organizational Capability: Structure,Culture and Roles50 Questions
Exam 4: Chartering Projects39 Questions
Exam 5: Stakeholder Analysis and Communication Planning46 Questions
Exam 6: Defining Scope and Constructing Work Breakdown Structures WBS44 Questions
Exam 7: Scheduling Activities56 Questions
Exam 8: Resourcing Projects45 Questions
Exam 9: Budgeting Projects46 Questions
Exam 10: Project Risk Planning45 Questions
Exam 11: Project Quality Planning and Project Kick-Off45 Questions
Exam 12: Project Supply Chain Management45 Questions
Exam 13: Leading and Managing Project Teams46 Questions
Exam 14: Determining Project Progress and Results44 Questions
Exam 15: Finishing the Project30 Questions
Select questions type
Organizing the second level of the Work Breakdown Structure by major design components facilitates rolling wave planning.
Free
(True/False)
4.8/5
(46)
Correct Answer:
False
Define Scope is the process of developing:
Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
B
The project scope is the work that must be performed to deliver a product,service or result with the specified features and functions.
Free
(True/False)
5.0/5
(37)
Correct Answer:
True
A deliverable at the lowest level of each branch of a work breakdown structure is known as:
(Multiple Choice)
4.9/5
(29)
Almost all projects have deliverables dealing with documentation and customer enablement in addition to the primary deliverable.
(True/False)
4.8/5
(38)
The project scope refers to the features and functions that characterize a product,service or result.
(True/False)
4.8/5
(30)
A Work Breakdown Structure (WBS)component is a term that simply refers to an entry in the WBS that can be at any level.
(True/False)
4.8/5
(31)
A WBS dictionary is a document that defines each of the terms used in the project scope statement.
(True/False)
4.9/5
(35)
Baselining is defined as a technique for dividing and subdividing the project scope and project deliverables into smaller,more manageable parts.
(True/False)
4.7/5
(44)
A Work Breakdown Structure must be decomposed at least four levels in order to be effective.
(True/False)
4.7/5
(35)
The Work Breakdown Structure is normally developed by listing major deliverables and then progressively smaller ones,until the team feels that every deliverable has been identified.
(True/False)
4.9/5
(41)
A typical change request form will include which of the following content items?
(Multiple Choice)
4.8/5
(37)
The approved set of procedures that describe how modifications to the project deliverables and documentation will be managed and controlled are collectively known by which of the following terms?
(Multiple Choice)
4.8/5
(34)
The project scope statement will frequently state what features and work elements are excluded from the project in addition to stating which are included.
(True/False)
4.9/5
(30)
In order to construct a project Work Breakdown Structure,a project team needs to enlist support from subject matter experts who understand how each portion of the work will be accomplished.
(True/False)
4.9/5
(36)
Failure to include project management in the Work Breakdown Structure will increase the likelihood that the project will finish late or over budget.
(True/False)
4.9/5
(21)
Which of the following statements is true concerning the adoption of rolling wave planning in project management?
(Multiple Choice)
4.8/5
(32)
All of the following elements should be included in a project scope statement EXCEPT:
(Multiple Choice)
4.8/5
(35)
Which of the following is not a format that is typically used to represent a Work Breakdown Structure?
(Multiple Choice)
4.8/5
(33)
If a problem occurs during project execution,the Work Breakdown Structure can be used to understand exactly where and why the problem occurred.
(True/False)
5.0/5
(44)
Showing 1 - 20 of 44
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)