A master production schedule shows the following information: A master production schedule shows the following information:   Using a lot-for-lot rule, what is the MSP quantity for week 4? Using a lot-for-lot rule, what is the MSP quantity for week 4?

(Multiple Choice)
4.8/5
(35)

A master production schedule shows the following information: A master production schedule shows the following information:   Based on the information in the MPS, what is the amount that is available to promise in week 4? Based on the information in the MPS, what is the amount that is available to promise in week 4?

(Multiple Choice)
4.9/5
(39)

The following table shows capacity requirements data for making table tops. The following table shows capacity requirements data for making table tops.   Which of the following is TRUE? Which of the following is TRUE?

(Multiple Choice)
4.7/5
(31)

The entire time period covered by the MPS is the:

(Multiple Choice)
4.8/5
(47)

A master production schedule shows the following information: A master production schedule shows the following information:   What is the available to promise for period 2? What is the available to promise for period 2?

(Multiple Choice)
4.8/5
(36)

The longest lead time path in the BOM is the:

(Multiple Choice)
4.9/5
(33)

Which of the following is NOT an input into the MRP?

(Multiple Choice)
4.7/5
(39)

The positioning and replenishment of finished goods inventories at the retail level can be determined using:

(Multiple Choice)
4.9/5
(35)

Which of the following is NOT an input to an MRP system?

(Multiple Choice)
4.9/5
(34)

If the planning horizon is 12 weeks, the cumulative lead time must be:

(Multiple Choice)
4.9/5
(43)

Benefits of ERP systems include all of the following EXCEPT:

(Multiple Choice)
4.9/5
(33)

Advanced planning and scheduling systems:

(Multiple Choice)
4.8/5
(40)

A company has decided to outsource the production of key components for its main product to suppliers.What affect will this have on the product's bill of materials?

(Multiple Choice)
4.9/5
(36)

An MRP Schedule is as follows.What are the net requirements in Week 2? An MRP Schedule is as follows.What are the net requirements in Week 2?

(Multiple Choice)
4.8/5
(42)

A master production schedule shows the beginning inventory is 50 units, the forecast is 200 units and actual customer orders are 220 units.What is the quantity that is available to promise in period 1?

(Multiple Choice)
4.9/5
(39)

End item A is made by assembling 2 of part B and 3 of part C.Part C is made from 2 of component D and 2 of component E.Component D is considered to be a:

(Multiple Choice)
4.9/5
(29)

Which of the following is NOT included in the information about the inventory records file for an item?

(Multiple Choice)
4.8/5
(29)

An end item A is made by assembling 4 of component B and 1 of component C.Component B is made from 2 of part D and 4 of part E.Within the bill of materials, component B is considered to be

(Multiple Choice)
4.7/5
(38)

Using the BOM, if 2 units of A are needed, how many used of K will be required? Assume that there is no on-hand inventory of any items. Using the BOM, if 2 units of A are needed, how many used of K will be required? Assume that there is no on-hand inventory of any items.

(Multiple Choice)
4.9/5
(30)

A detailed description of an "end item" along with a list of all of its raw materials, parts, and subassemblies is shown in a:

(Multiple Choice)
4.8/5
(42)