Which of the following most accurately describes the role of quality in a lean/just-in-time manufacturing environment?

(Multiple Choice)
4.8/5
(30)

Zanadu Corp.produces several different colors of a product on a single production line.It used to take several hours to switch colors, but now Zanadu has found a way to prepare for changing colors in a few minutes.This was most likely accomplished by:

(Multiple Choice)
4.7/5
(36)

Lean design strives to achieve which of the following objectives?

(Multiple Choice)
4.8/5
(41)

Which of the following lean principles best communicates the notion of demand synchronization?

(Multiple Choice)
4.8/5
(30)

We observe a man working on a setup.During the process of setting up, the man positions the die at a first position.He then runs through a few pieces to check whether or not they are acceptable.He then repositions the die and repeats the process.What we have observed is which of the following forms of waste?

(Multiple Choice)
4.9/5
(37)

A standard electrical plug fits into an outlet in only one way because one of the two prongs is larger than the other.This ensures that people will insert the plug properly to create a grounded circuit.This is an example of:

(Multiple Choice)
4.9/5
(39)

Which of the following are NOT associated with quality at the source?

(Multiple Choice)
4.9/5
(35)

A production kanban authorizes a worker to:

(Multiple Choice)
4.7/5
(28)

C-TPAT or Customs-Trade Partnership Against Terrorism is a program designed to manage the flow of orders across borders.It is an example of which of the following risks for lean supply chains?

(Multiple Choice)
4.9/5
(36)

Which of the following two areas does lean/just-in-time production focus its attention on? I.Cost II)Quality III)Variance IV)Waste

(Multiple Choice)
4.7/5
(39)

Tools at the point of use is an example of which of the following elements of the 5-S program?

(Multiple Choice)
4.8/5
(36)

Applying lean systems to supply chain relationships has which of the following risks?

(Multiple Choice)
4.9/5
(27)

When lean systems are implemented:

(Multiple Choice)
4.8/5
(38)

In a lean system, waste is any action that

(Multiple Choice)
4.8/5
(35)

In which operational setting has lean/just-in-time experienced the lowest levels of acceptance/implementation?

(Multiple Choice)
4.9/5
(28)