Exam 7: Lean Thinking and Lean Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A kanban system cannot be used in service industries.

(True/False)
4.8/5
(35)

Which of the following best represents the idea behind the 5 Why technique?

(Multiple Choice)
4.9/5
(31)

Which of the following statements regarding lean systems is FALSE?

(Multiple Choice)
4.9/5
(38)

What are the five tenets of lean thinking? In your own words,provide a road map for implementing lean thinking in a manufacturing or service operations.

(Essay)
4.7/5
(45)

For production control,lean pull systems are best suited for

(Multiple Choice)
4.9/5
(40)

Under a lean thinking philosophy,which of the following would LEAST likely be considered waste?

(Multiple Choice)
4.9/5
(46)

External setups refer to actions that require stopping the production process.

(True/False)
4.8/5
(35)

Which of the following is true for takt time in a lean system?

(Multiple Choice)
4.9/5
(33)

Which of the following is NOT an element of lean?

(Multiple Choice)
4.9/5
(38)

Which of the following statements regarding lean systems is FALSE?

(Multiple Choice)
4.8/5
(24)

Supplier relationships in a lean system are usually developed as an "integrated supplier program" that includes

(Multiple Choice)
4.8/5
(40)

Preventive maintenance is another term for stabilizing the master schedule.

(True/False)
4.9/5
(40)
Showing 41 - 52 of 52
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)