Exam 7: Work Design and Measurement
Exam 1: Introduction to Operations Management74 Questions
Exam 2: Competitiveness, Strategy, and Productivity72 Questions
Exam 3: Forecasting164 Questions
Exam 4: Product and Service Design76 Questions
Exam 4: Extension: Reliability12 Questions
Exam 5: Strategic Capacity Planning for Products and Services106 Questions
Exam 5: Extension: Decision Theory123 Questions
Exam 6: Process Selection and Facility Layout150 Questions
Exam 7: Work Design and Measurement151 Questions
Exam 7: Extension: Learning Curves68 Questions
Exam 8: Location Planning and Analysis80 Questions
Exam 8: Extension: The Transportation Model20 Questions
Exam 9: Management of Quality102 Questions
Exam 10: Quality Control141 Questions
Exam 10: Extension: Acceptance Sampling65 Questions
Exam 11: Aggregate Planning and Master Scheduling88 Questions
Exam 12: MRP and ERP89 Questions
Exam 13: Inventory Management161 Questions
Exam 14: Jit and Lean Operations87 Questions
Exam 14: Extension: Maintenance38 Questions
Exam 15: Supply Chain Management89 Questions
Exam 16: Scheduling134 Questions
Exam 17: Project Management137 Questions
Exam 18: Management of Waiting Lines81 Questions
Exam 19: Linear Programming111 Questions
Select questions type
A methods and measurements analyst needs to develop a time standard for a certain task. In a preliminary study, he observed one of his workers perform this task five times, with the following results: Observation 1 2 3 4 5 Time (seconds) 84 76 80 84 76 How many observations should be made if the analyst wants to be 99.74 percent confident that the maximum error in the observed time is two seconds? Assume that the standard deviation of each task time is four seconds.
(Multiple Choice)
4.8/5
(40)
Work measurement concentrates on how long the tasks take to accomplish.
(True/False)
4.8/5
(37)
The most widely used method of work measurement is work sampling.
(True/False)
4.8/5
(37)
The manager of Lawn and Garden Services would like to estimate the proportion of her employees' time spent performing various gardening and lawn care activities. She has made 400 random observations of a typical worker, with the following results: Activity Times Observed Mowing 200 Trimming 80 Raking 40 Miscellaneous 80 What is the most likely true proportion of time spent mowing?
(Multiple Choice)
4.9/5
(30)
Asking a group of employees at a particular level to take on more responsibility is a form of ___________ loading, also known as job __________.
(Multiple Choice)
4.8/5
(37)
In work sampling, how will increasing the permissible maximum error affect sample size?
(Multiple Choice)
4.7/5
(30)
The design of work systems typically involves:
(I) work measurement.
(II) job design.
(III) compensation.
(IV) the use of outside consultants.
(Multiple Choice)
4.8/5
(40)
One therblig is the equivalent of one hour of sustained work by one average person.
(True/False)
4.8/5
(34)
In a stopwatch time study, the number of cycles that must be timed is a function of:
(I) the variability of observed times.
(II) the desired accuracy for the estimated job time.
(III) the desired confidence for the estimated job time.
(Multiple Choice)
4.9/5
(34)
Predetermined time standards use historical data from a company's own files.
(True/False)
4.8/5
(41)
What is the effect of an increase in the desired confidence level on the number of observations necessary in a time study?
(Multiple Choice)
4.9/5
(30)
Predetermined time standards are usually based on observing one very efficient worker performing the task.
(True/False)
4.9/5
(32)
Methods analysis and motion study techniques develop which aspects of jobs?
(Multiple Choice)
4.8/5
(39)
The manager of Lawn and Garden Services would like to estimate the proportion of her employees' time spent performing various gardening and lawn care activities. She has made 400 random observations of a typical worker, with the following results: Activity Times Observed Mowing 200 Trimming 80 Raking 40 Miscellaneous 80 Between what limits can the manager be 68.26 percent confident about the true proportion of time spent mowing?
(Multiple Choice)
4.9/5
(42)
Giving a worker a larger portion of the total task is known as job:
(Multiple Choice)
4.9/5
(35)
One of the potential benefits of self-directed teams is higher productivity and greater worker satisfaction.
(True/False)
4.8/5
(41)
A methods and measurements analyst for Digital Devices needs to develop a time standard for the task of assembling a computer mouse. In a preliminary study, she observed one of her workers perform this task six times with the following results: Observation 1 2 3 4 5 6 Time (seconds) 46 38 40 34 42 40 What is the standard time for this task if the employee worked at a 20 percent faster pace than average and an allowance of 25 percent of the workday is used?
(Multiple Choice)
4.7/5
(32)
One important factor that influences productivity is trust between workers and managers.
(True/False)
4.8/5
(47)
A methods and measurements analyst for Timepiece, Inc., needs to develop a time standard for the task of attaching a watch to a wristband. In a preliminary study, he observed one of his workers perform this task five times, with the following results: Observation 1 2 3 4 5 Time (seconds) 27 19 20 21 13 How many observations should be made if he wants to be 95.44 percent confident that the maximum error in the observed time is one second? Assume that the standard deviation of the task time is five seconds.
(Multiple Choice)
4.9/5
(40)
Showing 101 - 120 of 151
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)