Exam 8: Evaluating Public Relations Effectiveness

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A common mistake in measuring public relations effectiveness is

Free
(Multiple Choice)
4.9/5
(37)
Correct Answer:
Verified

E

Which of the following is NOT one of the factors normally considered in standard pretest and posttest evaluation design:

Free
(Multiple Choice)
5.0/5
(30)
Correct Answer:
Verified

B

___________________ involves preparing advance statements,usually during the planning phase of a program,concerning legitimate expectations from a given efforts and when evaluation occurs,objectives are compared to accomplishments.

Free
(Multiple Choice)
4.9/5
(34)
Correct Answer:
Verified

B

__________________ is a basic MBO step.

(Multiple Choice)
4.9/5
(33)

______________ evaluation considers what people read in various types of publications.

(Multiple Choice)
4.8/5
(32)

When impact is evaluated,practitioners measure the number of people who ________________.

(Multiple Choice)
4.7/5
(32)

If results of a program are compared to objectives following the completion of an effort,what type of evaluation is being conducted?

(Multiple Choice)
4.8/5
(31)

Which of the following is NOT one of the overlooked ideas that often leads to measurement error?

(Multiple Choice)
4.9/5
(30)

____________________ models attempt to incorporate factors outside the control of the public relations campaign when assessing its effectiveness.

(Multiple Choice)
4.8/5
(32)

The efficiency of a message is the extent to which it actually _______________ the intended audience.

(Multiple Choice)
4.9/5
(35)

_______________ is a method of evaluation emphasizing the importance of such factors as unintended audiences and economic situations.

(Multiple Choice)
4.7/5
(34)

Learning about failures of an effort helps to assist in the development of future efforts because _____________.

(Multiple Choice)
5.0/5
(44)

Comparing posttest results to pretest results in evaluation is __________.

(Multiple Choice)
4.9/5
(36)

PRTrack,a software package,is designed to calculate _______________.

(Multiple Choice)
4.8/5
(44)

_____________ monitoring is conducted at regular intervals during campaigns to determine the effectiveness of the program.

(Multiple Choice)
4.9/5
(34)

______________ can be evaluated by investigating the activity of the organization's media representative.

(Multiple Choice)
4.9/5
(38)

Evaluating __________________ may involve examining the adequacy of the background information gathered,the appropriateness of the message content and format,and the quality of the message.

(Multiple Choice)
4.9/5
(38)

A ________________________ limits its scope to the messages and events planned for the campaign and their effects on the intended publics.

(Multiple Choice)
4.8/5
(42)

The data that results from ___________________ evaluation can be used to predict whether the messages used in a program will cause favorable reaction.

(Multiple Choice)
4.9/5
(35)

The number of radio and television stations that pick up and use a public relations message (VNR or news release)are counted in _______________ evaluation.

(Multiple Choice)
4.8/5
(33)
Showing 1 - 20 of 31
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)