Exam 14: Materials and Resource Requirements Planning
Exam 1: Introduction to Managing Operations Across the Supply Chain25 Questions
Exam 2: Operations and Supply Chain Strategy20 Questions
Exam 3: Managing Processes and Capacity25 Questions
Exam 3: Extension: Process Mapping and Analysis25 Questions
Exam 4: Productprocess Innovation25 Questions
Exam 5: Manufacturing and Service Process Structures30 Questions
Exam 6: Managing Quality30 Questions
Exam 6: Extension: Quality Improvement Tools30 Questions
Exam 7: Managing Inventories40 Questions
Exam 8: Lean Systems30 Questions
Exam 9: Customer Service Management25 Questions
Exam 10: Sourcing and Supply Management30 Questions
Exam 11: Logistics Management25 Questions
Exam 12: Demand Planning: Forecasting and Demand Management35 Questions
Exam 13: Sales and Operations Planning30 Questions
Exam 14: Materials and Resource Requirements Planning29 Questions
Exam 15: Project Management25 Questions
Exam 15: Extension: Advanced Methods for Project Scheduling22 Questions
Exam 16: Sustainable Operations Managementpreparing for the Future26 Questions
Select questions type
A master production schedule shows the following information:
Using a lot-for-lot rule, what is the MPS quantity for period 1?

Free
(Multiple Choice)
4.8/5
(32)
Correct Answer:
B
Benefits of ERP systems include all of the following EXCEPT:
Free
(Multiple Choice)
4.9/5
(40)
Correct Answer:
A
Jones Company uses widgets as component parts. In a particular week it has gross requirements for 250 units of widgets, beginning inventory of 50 widgets, and scheduled receipts of 350 widgets. Available inventory for the next period is:
Free
(Multiple Choice)
4.7/5
(36)
Correct Answer:
D
End item A is made by assembling 2 parts of B and 4 parts of C. Part C is made from 3 parts of D and 2 parts of E. Gross requirements for end item A are 100 units.
What is the net requirement for part C?

(Multiple Choice)
4.9/5
(35)
The positioning and replenishment of finished goods inventories at the retail level can be determined using:
(Multiple Choice)
4.7/5
(35)
MRP is a process that would be most applicable in which situation?
(Multiple Choice)
4.9/5
(40)
Significant changes in an MPS quantity several weeks into the planning horizon can:
(Multiple Choice)
4.8/5
(33)
The following table shows capacity requirements data for making Blodgetts.
A load profile would show:

(Multiple Choice)
4.8/5
(27)
Software that consolidates all of the business planning systems and data throughout an organization is:
(Multiple Choice)
4.9/5
(39)
A master production schedule shows the following information:
Based on the information in the MPS, what is the amount that is available to promise in week 4?

(Multiple Choice)
5.0/5
(43)
Which of the following is NOT included in the information about the inventory records file for an item?
(Multiple Choice)
4.8/5
(35)
The quantities of end items to be completed in each time period into the future is shown in a(n):
(Multiple Choice)
4.7/5
(36)
A master production schedule shows the following information:
Using a lot-for-lot rule, what is the MSP quantity for week 4?

(Multiple Choice)
4.8/5
(40)
An MRP record for a motor is shown in the following table.
What is the planned order release for week 4?

(Multiple Choice)
4.8/5
(41)
End item A is made by assembling 2 parts of B and 4 parts of C. Part C is made from 3 parts of D and 2 parts of E. Gross requirements for end item A are 100 units.
What is the gross requirement for part E?

(Multiple Choice)
4.8/5
(31)
A master production schedule shows the following information:
What is the available to promise for period 2?

(Multiple Choice)
4.9/5
(33)
If the cumulative lead time is 8 weeks, to be feasible the MPS planning horizon must be:
(Multiple Choice)
4.9/5
(36)
Planning for which of the following products would see the LEAST benefit from the use of an MRP system?
(Multiple Choice)
4.7/5
(42)
Showing 1 - 20 of 29
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)