Exam 14: Materials and Resource Requirements Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A master production schedule shows the following information: A master production schedule shows the following information:   Using a lot-for-lot rule, what is the MPS quantity for period 1? Using a lot-for-lot rule, what is the MPS quantity for period 1?

Free
(Multiple Choice)
4.8/5
(32)
Correct Answer:
Verified

B

Benefits of ERP systems include all of the following EXCEPT:

Free
(Multiple Choice)
4.9/5
(40)
Correct Answer:
Verified

A

Jones Company uses widgets as component parts. In a particular week it has gross requirements for 250 units of widgets, beginning inventory of 50 widgets, and scheduled receipts of 350 widgets. Available inventory for the next period is:

Free
(Multiple Choice)
4.7/5
(36)
Correct Answer:
Verified

D

End item A is made by assembling 2 parts of B and 4 parts of C. Part C is made from 3 parts of D and 2 parts of E. Gross requirements for end item A are 100 units. End item A is made by assembling 2 parts of B and 4 parts of C. Part C is made from 3 parts of D and 2 parts of E. Gross requirements for end item A are 100 units.   What is the net requirement for part C? What is the net requirement for part C?

(Multiple Choice)
4.9/5
(35)

The positioning and replenishment of finished goods inventories at the retail level can be determined using:

(Multiple Choice)
4.7/5
(35)

MRP is a process that would be most applicable in which situation?

(Multiple Choice)
4.9/5
(40)

Significant changes in an MPS quantity several weeks into the planning horizon can:

(Multiple Choice)
4.8/5
(33)

The following table shows capacity requirements data for making Blodgetts. The following table shows capacity requirements data for making Blodgetts.   A load profile would show: A load profile would show:

(Multiple Choice)
4.8/5
(27)

Software that consolidates all of the business planning systems and data throughout an organization is:

(Multiple Choice)
4.9/5
(39)

A master production schedule shows the following information: A master production schedule shows the following information:   Based on the information in the MPS, what is the amount that is available to promise in week 4? Based on the information in the MPS, what is the amount that is available to promise in week 4?

(Multiple Choice)
5.0/5
(43)

Which of the following is NOT included in the information about the inventory records file for an item?

(Multiple Choice)
4.8/5
(35)

The quantities of end items to be completed in each time period into the future is shown in a(n):

(Multiple Choice)
4.7/5
(36)

A master production schedule shows the following information: A master production schedule shows the following information:   Using a lot-for-lot rule, what is the MSP quantity for week 4? Using a lot-for-lot rule, what is the MSP quantity for week 4?

(Multiple Choice)
4.8/5
(40)

An MRP record for a motor is shown in the following table. An MRP record for a motor is shown in the following table.   What is the planned order release for week 4? What is the planned order release for week 4?

(Multiple Choice)
4.8/5
(41)

End item A is made by assembling 2 parts of B and 4 parts of C. Part C is made from 3 parts of D and 2 parts of E. Gross requirements for end item A are 100 units. End item A is made by assembling 2 parts of B and 4 parts of C. Part C is made from 3 parts of D and 2 parts of E. Gross requirements for end item A are 100 units.   What is the gross requirement for part E? What is the gross requirement for part E?

(Multiple Choice)
4.8/5
(31)

A bill-of-materials file contains:

(Multiple Choice)
4.8/5
(37)

A master production schedule shows the following information: A master production schedule shows the following information:   What is the available to promise for period 2? What is the available to promise for period 2?

(Multiple Choice)
4.9/5
(33)

Which of the following is NOT an input into the MRP?

(Multiple Choice)
5.0/5
(37)

If the cumulative lead time is 8 weeks, to be feasible the MPS planning horizon must be:

(Multiple Choice)
4.9/5
(36)

Planning for which of the following products would see the LEAST benefit from the use of an MRP system?

(Multiple Choice)
4.7/5
(42)
Showing 1 - 20 of 29
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)