Exam 6: Statistical Quality Control
Exam 1: Introduction to Operations132 Questions
Exam 2: Operations Strategy and Competitiveness130 Questions
Exam 3: Product Design and Process Selection128 Questions
Exam 4: E-Commerce and Supply Chain Management138 Questions
Exam 5: Total Quality Management142 Questions
Exam 6: Statistical Quality Control132 Questions
Exam 7: Just-In-Time and Lean Systems137 Questions
Exam 8: Forecasting126 Questions
Exam 9: Capacity Planning and Facility Location137 Questions
Exam 10: Facility Layout139 Questions
Exam 11: Work System Design123 Questions
Exam 12: Independent Demand Inventory Management137 Questions
Exam 13: Aggregate Planning105 Questions
Exam 14: Resource Planning131 Questions
Exam 15: Scheduling131 Questions
Exam 16: Project Management124 Questions
Exam 17: Spreadsheet Modeling: an Introduction137 Questions
Exam 18: Introduction to Optimization108 Questions
Exam 19: Waiting Line Models129 Questions
Exam 20: Master Scheduling and Rough-Cut Capacity Planning57 Questions
Select questions type
Common causes of variation are also known as __________________________.
(Multiple Choice)
4.8/5
(50)
What is the first step that should be taken if an observation falls below the lower control limit on a control chart?
(Multiple Choice)
4.9/5
(44)
What is a graph that shows the probability or chance of accepting a lot given various proportions of defects in the lot?
(Multiple Choice)
4.7/5
(28)
Suppose that you want to measure the percentage of candles that are cut longer than 9 inches.Which control chart would be appropriate?
(Multiple Choice)
4.7/5
(42)
What are the two aspects to implementing the six-sigma concept?
(Multiple Choice)
4.8/5
(33)
What are preset ranges of acceptable quality characteristics?
(Multiple Choice)
4.8/5
(31)
What is a control chart that monitors changes in the dispersion or variability of a process?
(Multiple Choice)
4.7/5
(34)
For which of the following would a control chart for attributes not be appropriate?
(Multiple Choice)
4.9/5
(46)
What program at Intel enforces the policy to make chips in the same way at all facilities?
(Multiple Choice)
4.7/5
(42)
Suppose that you have calculated the control limits for a p-chart to be the following: LCL = 0.02 and UCL = 0.08.
Today,you took 10 samples of 20 units each.The first nine samples each had one defect.The last sample had zero defects.What can you conclude?
(Multiple Choice)
4.9/5
(35)
Statistical quality control is a subset of statistical process control.
(True/False)
4.9/5
(32)
What is the probability of a Type I error for a control chart with limits set at 3 standard deviations from the mean?
(Multiple Choice)
4.8/5
(34)
Six sigma programs strive to set control limits at ________________________.
(Short Answer)
4.8/5
(42)
Showing 41 - 60 of 132
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)