Exam 6: Statistical Quality Control
Exam 1: Introduction to Operations132 Questions
Exam 2: Operations Strategy and Competitiveness130 Questions
Exam 3: Product Design and Process Selection128 Questions
Exam 4: E-Commerce and Supply Chain Management138 Questions
Exam 5: Total Quality Management142 Questions
Exam 6: Statistical Quality Control132 Questions
Exam 7: Just-In-Time and Lean Systems137 Questions
Exam 8: Forecasting126 Questions
Exam 9: Capacity Planning and Facility Location137 Questions
Exam 10: Facility Layout139 Questions
Exam 11: Work System Design123 Questions
Exam 12: Independent Demand Inventory Management137 Questions
Exam 13: Aggregate Planning105 Questions
Exam 14: Resource Planning131 Questions
Exam 15: Scheduling131 Questions
Exam 16: Project Management124 Questions
Exam 17: Spreadsheet Modeling: an Introduction137 Questions
Exam 18: Introduction to Optimization108 Questions
Exam 19: Waiting Line Models129 Questions
Exam 20: Master Scheduling and Rough-Cut Capacity Planning57 Questions
Select questions type
A p-chart is used when we can compute only the number of defects but not the total sample size.
(True/False)
4.8/5
(34)
The Six Sigma approach is organized around a _______ plan known as ________.
(Multiple Choice)
4.9/5
(37)
What technique answers the question of whether the process is functioning properly or not?
(Multiple Choice)
4.9/5
(34)
Six-sigma quality implies how many average defects per million?
(Multiple Choice)
4.7/5
(37)
What is the upper control limit for a c-chart if the total defects found over 200 samples equals 32?
(Multiple Choice)
5.0/5
(42)
Compute the Cpk measure of process capability for the following machine and interpret the findings.What value would you have obtained with the Cp measure?
(Short Answer)
4.9/5
(31)
Causes of variation that can be identified and eliminated are called what?
(Multiple Choice)
4.8/5
(39)
Each day for two workweeks (10 days total),George weighs 4 bags from that day's production.If the average of the means is 14 oz.and the average range is 0.4 oz.,what is the lower control limit for an x-bar chart for this process?
(Multiple Choice)
4.8/5
(37)
A graph that shows the probability or chance of accepting a lot given various proportions of defects in the lot is called an ____________________.
(Short Answer)
4.9/5
(36)
What is a control chart that monitors the proportion of defects in a sample?
(Multiple Choice)
4.9/5
(47)
Two areas of operations management that are particularly affected by the decision to increase the level of quality and reduce the number of product defects are ____ and ___ ___
(Short Answer)
4.8/5
(30)
What is the term for the probability that a value falling outside the control limits is still due to normal variation?
(Multiple Choice)
4.9/5
(41)
What is a distribution called when the same numbers of observations are below the mean as are above the mean?
(Multiple Choice)
4.7/5
(29)
What is a control chart that monitors changes in the mean value of a process?
(Multiple Choice)
4.7/5
(41)
A process can be considered in a state of control even if one observation is 1.75 standard deviations above the mean.
(True/False)
4.7/5