Exam 7: Just-In-Time and Lean Systems
Exam 1: Introduction to Operations132 Questions
Exam 2: Operations Strategy and Competitiveness130 Questions
Exam 3: Product Design and Process Selection128 Questions
Exam 4: E-Commerce and Supply Chain Management138 Questions
Exam 5: Total Quality Management142 Questions
Exam 6: Statistical Quality Control132 Questions
Exam 7: Just-In-Time and Lean Systems137 Questions
Exam 8: Forecasting126 Questions
Exam 9: Capacity Planning and Facility Location137 Questions
Exam 10: Facility Layout139 Questions
Exam 11: Work System Design123 Questions
Exam 12: Independent Demand Inventory Management137 Questions
Exam 13: Aggregate Planning105 Questions
Exam 14: Resource Planning131 Questions
Exam 15: Scheduling131 Questions
Exam 16: Project Management124 Questions
Exam 17: Spreadsheet Modeling: an Introduction137 Questions
Exam 18: Introduction to Optimization108 Questions
Exam 19: Waiting Line Models129 Questions
Exam 20: Master Scheduling and Rough-Cut Capacity Planning57 Questions
Select questions type
The central belief of the JIT philosophy is elimination of waste)What are the other beliefs that help define this philosophy?
(Essay)
4.7/5
(35)
The challenge for service operations is that they have to synchronize their __________ with demand.
(Multiple Choice)
4.8/5
(30)
According to JIT,by eliminating inventory we can clearly identify obsolete products and work on eliminating them.
(True/False)
4.9/5
(38)
An improvement tool that utilizes cross-functional teams to plan and deliver improvements to specific processes during two- or three-day marathon sessions is called a kanban blitz.
(True/False)
4.9/5
(41)
It the goal is to reduce the amount of inventory in the system,the number of Kanban cards should
(Multiple Choice)
4.9/5
(32)
Frank's umbrella corporation is designing a kanban system.They know that they are expected to produce 100 umbrellas per hour.They've also determined that a key external resource takes 30 minutes to deliver the required material once an order has been transmitted.To start with they want to maintain a safety stock of 25 critical parts.Originally they want to start with 3 kanbans.What container size should Frank's umbrella company start with?
(Short Answer)
4.9/5
(43)
Services organizations cannot use the JIT philosophy to reduce cycle time.
(True/False)
4.9/5
(40)
Quality problems in manufacturing can come from many sources,including all of the following except
(Multiple Choice)
4.8/5
(34)
Scheduling two,12-hour shifts and a 4-hour housekeeping and repair shift each workday is an example of ___________________.
(Short Answer)
4.9/5
(26)
What is the term that means giving workers authority to stop the production line when quality problems are encountered?
(Multiple Choice)
4.9/5
(32)
JIT believes in developing __________ relationships with suppliers.
(Multiple Choice)
4.7/5
(37)
If the goal is to reduce the amount of inventory in the system,the number of Kanban cards should be increased.
(True/False)
4.9/5
(43)
Consider a workstation that can process 1200 units per hour.It takes 1.5 hours to receive an order from the previous station.The container size is 40 units.The factory sets safety stock at 20 percent of demand during lead time.How many kanbans are needed for the workstation?
(Short Answer)
4.8/5
(49)
Which of the following is not a characteristic of bottom-round management?
(Multiple Choice)
4.8/5
(43)
Showing 61 - 80 of 137
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)