Exam 7: Just-In-Time and Lean Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is not considered to be a key element of JIT supplier relationships?

(Multiple Choice)
4.8/5
(38)

The system of Kanbans used to coordinate delivery of goods by suppliers can include all of the following except

(Multiple Choice)
4.9/5
(32)

Which of the following is characteristic of the JIT philosophy?

(Multiple Choice)
4.7/5
(25)

What are the benefits of JIT?

(Essay)
5.0/5
(41)

Traditional production plans schedule ________________________ while JIT with Level Scheduling uses ________________________.

(Short Answer)
4.7/5
(35)

Often the best quality problem resolution solution involves a complex answer as the organization is a complex organization.

(True/False)
4.8/5
(39)

Beliefs that help define the JIT philosophy include all of the following except

(Multiple Choice)
4.9/5
(30)

Successfully implementing JIT requires that it be done as quickly as possible.

(True/False)
4.8/5
(34)

JIT is often mistakenly assumed to

(Multiple Choice)
4.9/5
(40)

The benefits of long-term relationships with a small number of suppliers include all of the following except

(Multiple Choice)
4.8/5
(44)

One aspect of flexible resources is

(Multiple Choice)
4.8/5
(45)

In Japan,lifetime employment

(Multiple Choice)
4.8/5
(39)

JIT production workers are expected to

(Multiple Choice)
4.9/5
(35)

JIT changes happen in sequence because ________________________.

(Short Answer)
4.8/5
(34)

JIT considers waste anything that does not add value.

(True/False)
4.8/5
(34)

In JIT the workforce is viewed as

(Multiple Choice)
4.8/5
(39)

JIT concepts that are applicable to service organizations include use of multifunction workers.

(True/False)
4.8/5
(35)

Quality in just-in-time is centered on building quality into the

(Multiple Choice)
4.8/5
(31)

Frank James works for a production facility that makes car radios.His job is to insert the integrated circuits and make sure that they work correctly.He is expected to handle 20 radios per hour.The factory uses a Kanban production system with containers that hold four radios.It takes 60 minutes for Frank to receive the radios from the previous work station.The factory sets safety stock at 50 percent of demand during lead time.How many Kanbans are needed?

(Short Answer)
5.0/5
(28)

Which of the following is not a role of JIT management?

(Multiple Choice)
4.9/5
(47)
Showing 101 - 120 of 137
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)