Exam 15: Lean Accounting and Productivity Measurement

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Explain the difference between partial and total measures of productivity.

(Essay)
4.9/5
(35)

The accounting approach designed to support and encourage lean manufacturing is called __________ accounting.

(Short Answer)
4.8/5
(44)

The Marakesh Company provides the following data: The Marakesh Company provides the following data:   What is the partial operational productivity measure for materials for 2014? What is the partial operational productivity measure for materials for 2014?

(Multiple Choice)
4.8/5
(34)

At the end of 2014, Diatomic Company implemented a new labor process and redesigned its product with the expectation that input usage efficiency would increase. Now, at the end of 2015, the president of the company wants an assessment of the changes on the company's productivity. The data needed for the assessment are as follows: At the end of 2014, Diatomic Company implemented a new labor process and redesigned its product with the expectation that input usage efficiency would increase. Now, at the end of 2015, the president of the company wants an assessment of the changes on the company's productivity. The data needed for the assessment are as follows:   What is the total change in profits from 2014 to 2015? What is the total change in profits from 2014 to 2015?

(Multiple Choice)
4.8/5
(38)

Information about DeLorean Corporation is as follows: Information about DeLorean Corporation is as follows:   What is the price-recovery component? What is the price-recovery component?

(Multiple Choice)
4.8/5
(43)

Figure 15-1 The following information relates to Lancashire Manufacturing: To produce a unit of product: Figure 15-1 The following information relates to Lancashire Manufacturing: To produce a unit of product:   There is a wait time of 8 minutes before the mixing department begins a batch, 5 minutes between the mixing and molding departments, a move and pre-wait between molding and casting of 10 minutes, and a move and pre-wait between the casting and finishing departments of 12 minutes. Refer to Figure 15-1. How long would it take to process the first unit of a 20-unit batch under a cellular manufacturing setup? There is a wait time of 8 minutes before the mixing department begins a batch, 5 minutes between the mixing and molding departments, a move and pre-wait between molding and casting of 10 minutes, and a move and pre-wait between the casting and finishing departments of 12 minutes. Refer to Figure 15-1. How long would it take to process the first unit of a 20-unit batch under a cellular manufacturing setup?

(Multiple Choice)
4.8/5
(39)

Which is NOT a benefit of lean manufacturing?

(Multiple Choice)
4.9/5
(37)

The value stream

(Multiple Choice)
4.8/5
(35)

In a traditional manufacturing setup

(Multiple Choice)
4.9/5
(33)

Partial measures allow managers to focus on the use of the total production and are easily interpreted.

(True/False)
4.9/5
(33)

Productivity measurement is a quantitative assessment of increases or decreases in productivity.

(True/False)
4.8/5
(44)

Serendipity Manufacturing implemented lean manufacturing in its Wheeling plant as a pilot program. During the most recent three weeks, the following data pertaining to a specific product line value stream was collected:

(Essay)
4.8/5
(42)

Which of the following is true in regards to a lean accounting system?

(Multiple Choice)
4.8/5
(35)

Explain the difference between technical and input trade-off efficiency.

(Essay)
4.9/5
(39)

The following Box Scorecard template was prepared for a value stream at Compton Company: The following Box Scorecard template was prepared for a value stream at Compton Company:    Operational Units per Person On-Time Delivery Dock-to-Dock Days First-time Through Average Product Cost Capacity Productive Non-Productive Available Financial Weekly Sales Weekly Material Cost Weekly Conversion Cost Weekly Value-Stream Profit ROS Required:   Operational Units per Person On-Time Delivery Dock-to-Dock Days First-time Through Average Product Cost Capacity Productive Non-Productive Available Financial Weekly Sales Weekly Material Cost Weekly Conversion Cost Weekly Value-Stream Profit ROS Required: The following Box Scorecard template was prepared for a value stream at Compton Company:    Operational Units per Person On-Time Delivery Dock-to-Dock Days First-time Through Average Product Cost Capacity Productive Non-Productive Available Financial Weekly Sales Weekly Material Cost Weekly Conversion Cost Weekly Value-Stream Profit ROS Required:

(Essay)
4.9/5
(41)

The __________ is used by the lean control system to compare operational, capacity, and financial metrics.

(Short Answer)
4.8/5
(32)

If a facility has costs of $100,000 per year and 20,000 square feet, and if 19,000 square feet are absorbed by the value streams, what happens to the unabsorbed cost of the remaining 1,000 feet?

(Multiple Choice)
4.8/5
(34)

With multiple products in a value stream, unit cost will increase if

(Multiple Choice)
4.9/5
(36)

In the calculation of product costs for value streams with multiple products, units shipped instead of units produced is used as the denominator because

(Multiple Choice)
4.8/5
(34)

The achievement of __________ efficiency and __________ efficiency is the point of total productive efficiency.

(Short Answer)
4.9/5
(33)
Showing 141 - 160 of 172
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)