Exam 3: Product Design and Process Selection
Exam 1: Introduction to Operations Management132 Questions
Exam 2: Operations Strategy and Competitiveness135 Questions
Exam 3: Product Design and Process Selection128 Questions
Exam 4: E-Commerce and Supply Chain Management139 Questions
Exam 5: Total Quality Management141 Questions
Exam 6: Statistical Quality Control136 Questions
Exam 7: Just-In-Time and Lean Systems137 Questions
Exam 8: Forecasting138 Questions
Exam 9: Capacity Planning and Facility Location139 Questions
Exam 10: Facility Layout139 Questions
Exam 11: Work System Design132 Questions
Exam 12: Independent Demand Inventory Management137 Questions
Exam 13: Aggregate Planning104 Questions
Exam 14: Resource Planning133 Questions
Exam 15: Scheduling127 Questions
Exam 16: Project Management134 Questions
Exam 16: Spreadsheet Modeling: an Introduction137 Questions
Exam 17: Spreadsheet Modeling: an Introduction133 Questions
Exam 18: Waiting Line Models132 Questions
Exam 19: Master Scheduling and Rough-Cut Capacity Planning69 Questions
Select questions type
Which of the following is not included in the preliminary design and testing stage?
(Multiple Choice)
4.9/5
(37)
Which of the following is true regarding the relative predictability of the cycle of new product introductions?
(Multiple Choice)
4.8/5
(37)
What is the break-even volume given insurance costs of $30,000, materials costs of $6 per unit, taxes of $10,000, labor costs of $34 per unit, and a selling price of $80?
(Short Answer)
4.8/5
(36)
Product design and process selection decisions are typically made separately.
(True/False)
4.8/5
(34)
Which type of operation is used to produce many different products with varying process requirements in lower volumes?
(Multiple Choice)
4.8/5
(25)
What is an automated material handling system that basically is an automated warehouse?
(Multiple Choice)
4.8/5
(28)
What is included in the preliminary design and testing stage of product design?
(Essay)
4.9/5
(43)
When product and process design work together, much of the work is done in sequence rather than in parallel.
(True/False)
4.8/5
(36)
Triangle symbols are used in a process flowchart to represent decision points?
(True/False)
4.9/5
(39)
Since services are intangible, the design of the service needs ___________ .
(Multiple Choice)
4.7/5
(42)
Repetitive operations are used to produce many different products with varying process requirements in lower volumes.
(True/False)
4.9/5
(31)
If the third stage of a repetitive line process cannot complete its activities as fast as stage one or two it has become a:
(Multiple Choice)
4.9/5
(33)
Which type of operational function represents an Assemble-to-Order?
(Multiple Choice)
4.7/5
(33)
Vertical integration is a good strategic option for a manufacturing company when
(Multiple Choice)
4.7/5
(38)
Which of the following is a tool for evaluating an operation in terms of the sequence of steps from inputs to outputs with the goal of improving its design?
(Multiple Choice)
4.7/5
(37)
To remain competitive, companies must be innovative and bring out new products regularly.
(True/False)
4.8/5
(37)
At the preliminary design and testing stage of new product design, design engineers translate technical specifications into general performance specifications.
(True/False)
4.8/5
(29)