Project management includes three basic operations. Which is not one of those operations?

Free
(Multiple Choice)
5.0/5
(36)
Correct Answer:
Verified

B

When you break it down, you see that a business process is actually __________.

Free
(Multiple Choice)
4.8/5
(40)
Correct Answer:
Verified

C

The __________ is the traditional systems development method used by organizations for large IT projects such as IT infrastructure.

Free
(Multiple Choice)
4.8/5
(45)
Correct Answer:
Verified

B

A __________ is the smallest unit of work and management accountability that is not split into more detailed steps.

(Short Answer)
4.8/5
(40)

Which is not a characteristic of program testing?

(Multiple Choice)
4.8/5
(46)

Covert resistance to a new IS from employees may take the form of __________.

(Multiple Choice)
4.9/5
(41)

An) __________ is a set of technologies used for exchanging data between applications and for connecting processes with other systems across the organization, and with business partners.

(Multiple Choice)
4.9/5
(35)

If organizations focus exclusively on automation and cost savings, they might achieve significant operational efficiencies but lose their competitive edge.

(True/False)
4.7/5
(34)

The goal of loose coupling of apps is to reduce dependencies between systems to improve flexibility and agility.

(True/False)
4.9/5
(42)

After decades of business process reengineering attempts, organizations still have problems with their business operations. What are those problems?

(Multiple Choice)
4.9/5
(37)

When the system's logical and physical designs specifications are agreed upon and approved by all participants, they __________.

(Multiple Choice)
4.8/5
(38)

During the implementation stage, __________ tests are critical because they determine whether the process is designed well from users' perspective.

(Multiple Choice)
4.8/5
(36)

Select a standard business process, such as payroll. Draw a flowchart of an app for that business process.

(Short Answer)
4.8/5
(36)

Web services can connect processes with other systems across the organization, and with business partners. The resulting integrated BPM systems are BPM mashups.

(True/False)
4.9/5
(39)

__________ conversion is the least expensive and highest risk IS conversion strategy because the old system is cut off and the new system is turned on at a certain point in time.

(Multiple Choice)
4.9/5
(40)

A __________ is a type of bar chart that shows a project schedule.

(Short Answer)
4.8/5
(32)

SOA and BPM both focus on creating a more flexible IT architecture and optimizing the way actual work gets done.

(True/False)
5.0/5
(31)

After decades of reengineering attempts, organizations no longer duplicate processes or perform non-core tasks that should be outsourced.

(True/False)
4.8/5
(45)

Process design is typically mapped and documented using a modeling tool, such as Microsoft Excel.

(True/False)
4.9/5
(39)

For in-house development, the __________ option should be considered only for specialized IT apps for which components are not available because this option is expensive and slow.

(Multiple Choice)
4.8/5
(28)
Showing 1 - 20 of 75