Exam 18: Operational Decision-Making Tools: Acceptance Sampling
Exam 1: Introduction to Operations and Supply Chain Management74 Questions
Exam 2: Quality Management86 Questions
Exam 3: Statistical Process Control161 Questions
Exam 4: Product Design81 Questions
Exam 5: Service Design77 Questions
Exam 6: Processes and Technology48 Questions
Exam 7: Capacity and Facilities Design90 Questions
Exam 8: Human Resources85 Questions
Exam 9: Project Management98 Questions
Exam 10: Supply Chain Management Strategy and Design73 Questions
Exam 11: Global Supply Chain Procurement and Distribution96 Questions
Exam 12: Forecasting99 Questions
Exam 13: Inventory Management25 Questions
Exam 14: Sales and Operations Planning34 Questions
Exam 15: Resource Planning86 Questions
Exam 16: Lean Systems99 Questions
Exam 17: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 18: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 19: Operational Decision-Making Tools: Facility Location Models23 Questions
Exam 20: Operational Decision-Making Tools: Work Measurement29 Questions
Exam 21: Operational Decison-Making Tools: Transportation and Transshipment Models102 Questions
Exam 22: Operational Decision-Making Tools: Simulation84 Questions
Exam 23: Operational Decision-Making Tools: Linear Programming92 Questions
Select questions type
22. A(n) ________________ curve is a graph showing the probability of accepting a lot for different quality levels with a specific sampling plan.
(Multiple Choice)
4.8/5
(36)
23. The ______________________ is the expected number of defective items that will pass on to the customer with a sampling. plan is known as the
(Multiple Choice)
4.7/5
(36)
20. The ________________ is the consumer's willingness to accept lots with a small proportion of defective items is known as the acceptable
(Multiple Choice)
4.8/5
(35)
A sampling plan provides a set of guidelines for accepting rejecting a lot.
(Short Answer)
4.9/5
(35)
21. The _________________ is the maximumrepresents the upper limit to the number of defective items a customer will accept in a lot.
(Multiple Choice)
4.8/5
(35)
Acceptance sampling is not consistent with TQM's philosophy of zero defects.
(Short Answer)
4.9/5
(27)
An operating characteristics (OC) curve is a graph that measures the probability of accepting a lot with no defective items.
(True/False)
4.9/5
(34)
Acceptance sampling is based on the premise that a lot contains some acceptable number of defective items.
(True/False)
4.9/5
(37)
Showing 21 - 28 of 28
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)