A ________________ shows both planned and completed activities against a time scale.

Free
(Multiple Choice)
4.9/5
(43)
Correct Answer:
Verified

B

The ________________ method of linear programming can be used to assign workers to different jobs.

Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
Verified

C

If the following jobs are sequenced according to the first-come-first-served (FCFS) rule then the mean completion time in days for all jobs is (assume zero for today's date) If the following jobs are sequenced according to the first-come-first-served (FCFS) rule then the mean completion time in days for all jobs is (assume zero for today's date)

Free
(Multiple Choice)
4.9/5
(38)
Correct Answer:
Verified

B

If the following jobs are sequenced according to the FCFS rule then job C is completed on day (assume zero for today's date) If the following jobs are sequenced according to the FCFS rule then job C is completed on day (assume zero for today's date)

(Multiple Choice)
4.9/5
(38)

The sequencing rule that minimizes average tardiness for a set of jobs to be processed on one machine is

(Multiple Choice)
4.9/5
(38)

Who developed the theory of constraints (TOC) and what is its approach to scheduling?

(Essay)
4.8/5
(28)

______________ is the scheduling and monitoring of day-to-day production in a job shop.

(Multiple Choice)
4.8/5
(34)

If the following jobs are sequenced according to the SPT rule then job B is completed on day (assume zero for today's date) If the following jobs are sequenced according to the SPT rule then job B is completed on day (assume zero for today's date)

(Multiple Choice)
5.0/5
(33)

The assignment method of linear programming can be used for both loading and employee scheduling.

(True/False)
4.7/5
(35)

A work package travels with a job to specify what work needs to be done at a particular work station and where the job goes next.

(True/False)
4.8/5
(37)

Johnson's rule gives an optimal sequence for jobs processed serially through a two step system.

(True/False)
4.7/5
(38)

The first-come, first-served (FCFS) sequencing rule should be only used when operating at high levels of capacity.

(True/False)
4.9/5
(37)

_________________ scheduling involves loading work onto the work center, leveling the load, sequencing the work, and monitoring its progress.

(Multiple Choice)
4.8/5
(35)

If the following jobs are sequenced according to the SLACK rule then the total number of jobs that would be late is (assume zero for today's date) If the following jobs are sequenced according to the SLACK rule then the total number of jobs that would be late is (assume zero for today's date)

(Multiple Choice)
4.7/5
(40)

If the following jobs are sequenced according to the SLACK rule then the mean tardiness (in days) for all jobs is (assume zero for today's date) If the following jobs are sequenced according to the SLACK rule then the mean tardiness (in days) for all jobs is (assume zero for today's date)

(Multiple Choice)
4.9/5
(35)

The time required for a job to move through the system is referred to as flow time.

(True/False)
4.8/5
(38)

Four products (1, 2, 3, and 4) must be processed on one of four machines (A, B, C, and D). The times required in minutes for each product on each machine are shown below. Four products (1, 2, 3, and 4) must be processed on one of four machines (A, B, C, and D). The times required in minutes for each product on each machine are shown below.   If management wishes to assign products to machines so that the total time to complete all the products is minimized, then Product 1 is assigned to If management wishes to assign products to machines so that the total time to complete all the products is minimized, then Product 1 is assigned to

(Multiple Choice)
4.8/5
(34)

The shortest processing time (SPT) rule is most useful when the job shop is not congested.

(True/False)
4.7/5
(41)

Scheduling specifies when labor, equipment, and facilities are needed to produce a product.

(True/False)
4.8/5
(34)

______________ specifies when the labor, equipment and facilities are needed to produce a good or to provide a service.

(Multiple Choice)
4.9/5
(31)
Showing 1 - 20 of 99