Exam 23: Operational Decision-Making Tools: Linear Programming

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Given the following Product Structure Record Given the following Product Structure Record   The number of E's required for each A is The number of E's required for each A is

Free
(Multiple Choice)
5.0/5
(43)
Correct Answer:
Verified

C

Information concerning on-hand quantities, lot sizes, and lead time can be found in the master production schedule (MPS).

Free
(True/False)
4.8/5
(35)
Correct Answer:
Verified

False

Supply chain management (SCM) software plans and executes business processes related to a manufacturing firm.

Free
(True/False)
4.9/5
(32)
Correct Answer:
Verified

False

Because the item master file is an input into the MRP process, it should be routinely updated to reflect any revisions or changes.

(True/False)
4.8/5
(37)

A load profile displays underloads and overloads.

(True/False)
4.9/5
(36)

Effective capacity is determined by multiplying the rated capacity by utilization and efficiency.

(True/False)
4.8/5
(27)

Customer relationship management (CRM) software plans and executes business processes that involve customer interactions.

(True/False)
4.8/5
(46)

A forecast of dependent demand requirements is one of the major inputs into the MRP process.

(True/False)
4.8/5
(30)

The master production schedule (MPS) is a major input for the MRP process.

(True/False)
4.8/5
(35)

________________________ software plans and executes business processes involving supplier interaction.

(Multiple Choice)
4.7/5
(31)

Customer relationship management systems change the focus from managing products to managing customers.

(True/False)
4.8/5
(39)

How does MRP differ from traditional inventory control systems?

(Essay)
4.8/5
(33)

All of the following can be used for underloaded conditions except

(Multiple Choice)
4.8/5
(33)

Which of the following would not be used for an overloaded condition?

(Multiple Choice)
4.8/5
(36)

Material requirements planning (MRP) is a useful for all of the following except

(Multiple Choice)
4.9/5
(29)

______________ is a lot sizing technique that orders for multiple demand periods is referred to as

(Multiple Choice)
4.8/5
(39)

Given the following Product Structure Record Given the following Product Structure Record   The number of E's required for each A is The number of E's required for each A is

(Multiple Choice)
4.9/5
(42)

Given the following MRP matrix for Item D: Given the following MRP matrix for Item D:   The planned order receipt for period 6 is The planned order receipt for period 6 is

(Multiple Choice)
4.9/5
(36)

The item master file contains all the following except

(Multiple Choice)
4.7/5
(35)

What is the master production schedule (MPS) and what role does in play in the material requirements planning (MRP) process?

(Essay)
4.8/5
(49)
Showing 1 - 20 of 92