Exam 4: Statistical Process Control
Exam 1: Introduction to Operations and Supply Chain Management79 Questions
Exam 2: Supplement Operational Decision-Making Tools: Decision Analysis43 Questions
Exam 3: Quality Management91 Questions
Exam 4: Statistical Process Control103 Questions
Exam 5: Supplement Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 6: Product Design86 Questions
Exam 7: Service Design77 Questions
Exam 8: Processes and Technology47 Questions
Exam 9: Capacity and Facilities90 Questions
Exam 10: Supplement Operational Decision-Making Tools: Facility Location Models22 Questions
Exam 11: Human Resources90 Questions
Exam 12: Supplement Operational Decision-Making Tools: Work Measurement26 Questions
Exam 13: Project Management98 Questions
Exam 14: Supply Chain Management Strategy and Design73 Questions
Exam 15: Global Supply Chain Procurement and Distribution86 Questions
Exam 16: Supplement Operational Decision-Making Tools: Transportation and Transshipment Models28 Questions
Exam 17: Forecasting94 Questions
Exam 18: Inventory Management93 Questions
Exam 19: Supplement Operational Decision-Making Tools: Simulation25 Questions
Exam 20: Sales and Operations Planning85 Questions
Exam 21: Supplement Operational Decision-Making Tools: Linear Programming38 Questions
Exam 22: Enterprise Resource Planning92 Questions
Exam 23: Lean Systems86 Questions
Exam 24: Scheduling99 Questions
Select questions type
Statistical process control can prevent poor quality before it occurs if a pattern is evident in the plotted points.
Free
(True/False)
4.8/5
(40)
Correct Answer:
True
Common cause (random)variation provides evidence that the process is not in control.
Free
(True/False)
4.8/5
(37)
Correct Answer:
False
A control chart is in control when the plot of the sample points exhibits a pattern.
Free
(True/False)
4.9/5
(34)
Correct Answer:
False
Dumplings -To-Go (DTG)provides take-out dumplings and noodle dishes to customers at its chain of drive-through restaurants.The target for a customer's waiting time is 3.0 minutes +/- 1 minute.Each month,one of the managers observes the drive-through process and collects a sample of 4 waiting times a day over a 6 day period.The data from one restaurant appears below.If DTG were to construct an R-chart from this data,the centerline would be 

(Multiple Choice)
4.8/5
(29)
Consider a production process that produces tires.A quality engineer has taken 15 samples,each containing 200 tires.The total number of defective tires over the 15 samples is 340.The centerline for the control chart is
(Multiple Choice)
4.8/5
(43)
Control charts are typically used at the ___________ of a process.
(Multiple Choice)
4.8/5
(35)
After special cause variation is detected,the focus changes to identifying the root cause of the variation and eliminating it.
(True/False)
4.7/5
(34)
A process that is determined to be in control contains no variation.
(True/False)
4.7/5
(38)
The formulas for determining the upper and lower control limits are based on the number of standard deviations,z,from the process average.Management usually selects a z value of _______.
(Multiple Choice)
4.9/5
(27)
An x-bar and R-chart constructed to monitor and control a process use the same raw data.
(True/False)
4.9/5
(37)
Easy Tax is a service company that prepares tax returns.An outside auditor has examined 20 samples each containing one completed tax return.The total number of defects observed over the 20 samples is 200.The centerline for the control chart constructed is
(Multiple Choice)
4.9/5
(34)
Pizazz manufactures a 5.0 oz.energy drink of the same name.Because the cans are so small,consumers are concerned that they are not receiving the full 5 ounces in each can.A quality engineer at the company is charged with analyzing the filling process and ensuring accurate readings.On 15 different occasions over the past month,she has taken a sample of 6 energy drinks off the production line and recorded their weight.If the sum of the sample means is 80.20 ounces and the sum of the sample ranges is 12.68 ounces,what is the centerline of an R-chart for this process?
(Multiple Choice)
4.9/5
(27)
Pizazz manufactures a 5.0 oz.energy drink of the same name.Because the cans are so small,consumers are concerned that they are not receiving the full 5 ounces in each can.A quality engineer at the company is charged with analyzing the filling process and ensuring accurate readings.On 15 different occasions over the past month,she has taken a sample of 6 energy drinks off the production line and recorded their weight.If the sum of the sample means is 80.20 ounces and the sum of the sample ranges is 12.68 ounces,the centerline for an X-bar chart of this process would be
(Multiple Choice)
4.9/5
(43)
Which of the following statements concerning control chart limits is true?
(Multiple Choice)
4.9/5
(45)
A p-chart is used to monitor the proportion defective in the output of a process.
(True/False)
4.8/5
(36)
If a sample point plotted on a control chart is outside the control limits
(Multiple Choice)
4.9/5
(30)
Consider a production process that produces tires.A quality engineer has taken 15 samples,each containing 200 tires.The total number of defective tires over the 15 samples is 340.The LCL for the control chat constructed using two sigma is
(Multiple Choice)
4.8/5
(33)
Showing 1 - 20 of 103