Statistical process control can prevent poor quality before it occurs if a pattern is evident in the plotted points.

Free
(True/False)
4.8/5
(40)
Correct Answer:
Verified

True

Common cause (random)variation provides evidence that the process is not in control.

Free
(True/False)
4.8/5
(37)
Correct Answer:
Verified

False

A control chart is in control when the plot of the sample points exhibits a pattern.

Free
(True/False)
4.9/5
(34)
Correct Answer:
Verified

False

Dumplings -To-Go (DTG)provides take-out dumplings and noodle dishes to customers at its chain of drive-through restaurants.The target for a customer's waiting time is 3.0 minutes +/- 1 minute.Each month,one of the managers observes the drive-through process and collects a sample of 4 waiting times a day over a 6 day period.The data from one restaurant appears below.If DTG were to construct an R-chart from this data,the centerline would be Dumplings -To-Go (DTG)provides take-out dumplings and noodle dishes to customers at its chain of drive-through restaurants.The target for a customer's waiting time is 3.0 minutes +/- 1 minute.Each month,one of the managers observes the drive-through process and collects a sample of 4 waiting times a day over a 6 day period.The data from one restaurant appears below.If DTG were to construct an R-chart from this data,the centerline would be

(Multiple Choice)
4.8/5
(29)

Consider a production process that produces tires.A quality engineer has taken 15 samples,each containing 200 tires.The total number of defective tires over the 15 samples is 340.The centerline for the control chart is

(Multiple Choice)
4.8/5
(43)

Control charts are typically used at the ___________ of a process.

(Multiple Choice)
4.8/5
(35)

After special cause variation is detected,the focus changes to identifying the root cause of the variation and eliminating it.

(True/False)
4.7/5
(34)

A process that is determined to be in control contains no variation.

(True/False)
4.7/5
(38)

The formulas for determining the upper and lower control limits are based on the number of standard deviations,z,from the process average.Management usually selects a z value of _______.

(Multiple Choice)
4.9/5
(27)

An x-bar and R-chart constructed to monitor and control a process use the same raw data.

(True/False)
4.9/5
(37)

Easy Tax is a service company that prepares tax returns.An outside auditor has examined 20 samples each containing one completed tax return.The total number of defects observed over the 20 samples is 200.The centerline for the control chart constructed is

(Multiple Choice)
4.9/5
(34)

Pizazz manufactures a 5.0 oz.energy drink of the same name.Because the cans are so small,consumers are concerned that they are not receiving the full 5 ounces in each can.A quality engineer at the company is charged with analyzing the filling process and ensuring accurate readings.On 15 different occasions over the past month,she has taken a sample of 6 energy drinks off the production line and recorded their weight.If the sum of the sample means is 80.20 ounces and the sum of the sample ranges is 12.68 ounces,what is the centerline of an R-chart for this process?

(Multiple Choice)
4.9/5
(27)

Pizazz manufactures a 5.0 oz.energy drink of the same name.Because the cans are so small,consumers are concerned that they are not receiving the full 5 ounces in each can.A quality engineer at the company is charged with analyzing the filling process and ensuring accurate readings.On 15 different occasions over the past month,she has taken a sample of 6 energy drinks off the production line and recorded their weight.If the sum of the sample means is 80.20 ounces and the sum of the sample ranges is 12.68 ounces,the centerline for an X-bar chart of this process would be

(Multiple Choice)
4.9/5
(43)

Which of the following statements concerning control chart limits is true?

(Multiple Choice)
4.9/5
(45)

A p-chart is used to monitor the proportion defective in the output of a process.

(True/False)
4.8/5
(36)

An attribute measure is a product characteristic such as

(Multiple Choice)
4.8/5
(39)

A process is generally considered to be in control when

(Multiple Choice)
4.8/5
(26)

If a sample point plotted on a control chart is outside the control limits

(Multiple Choice)
4.9/5
(30)

Consider a production process that produces tires.A quality engineer has taken 15 samples,each containing 200 tires.The total number of defective tires over the 15 samples is 340.The LCL for the control chat constructed using two sigma is

(Multiple Choice)
4.8/5
(33)

The basic purpose of control charts include(s)

(Multiple Choice)