Exam 4: Statistical Process Control

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

For a p-chart,the standard deviation of the proportions is 0.084439.If p is 0.31,then the number of items in each sample is ______.

(Multiple Choice)
4.8/5
(39)

Dumplings -To-Go (DTG)provides take-out dumplings and noodle dishes to customers at its chain of drive-through restaurants.The target for a customer's waiting time is 3.0 minutes +/− 1 minute.Each month,one of the managers observes the drive-through process and collects a sample of 4 waiting times a day over a 6 day period.The data from one restaurant appears below.If DTG were to construct an X-bar chart from this data,the 3-sigma LCL would be Dumplings -To-Go (DTG)provides take-out dumplings and noodle dishes to customers at its chain of drive-through restaurants.The target for a customer's waiting time is 3.0 minutes +/− 1 minute.Each month,one of the managers observes the drive-through process and collects a sample of 4 waiting times a day over a 6 day period.The data from one restaurant appears below.If DTG were to construct an X-bar chart from this data,the 3-sigma LCL would be

(Multiple Choice)
4.9/5
(40)

Marble Inc.makes countertops from a variety of high-end materials.To monitor the quality of its production processes the company randomly selects one countertop and counts the number of blemishes.The results for ten samples are shown below: Marble Inc.makes countertops from a variety of high-end materials.To monitor the quality of its production processes the company randomly selects one countertop and counts the number of blemishes.The results for ten samples are shown below:   Given the sample information above,the average number of defects per unit for this process would be Given the sample information above,the average number of defects per unit for this process would be

(Multiple Choice)
4.7/5
(44)

Dumplings -To-Go (DTG)provides take-out dumplings and noodle dishes to customers at its chain of drive-through restaurants.The target for a customer's waiting time is 3.0 minutes +/- 1 minute.Each month,one of the managers observes the drive-through process and collects a sample of 4 waiting times a day over a 6 day period.The data from one restaurant appears below.If DTG were to construct an X-bar chart from this data,the centerline would be Dumplings -To-Go (DTG)provides take-out dumplings and noodle dishes to customers at its chain of drive-through restaurants.The target for a customer's waiting time is 3.0 minutes +/- 1 minute.Each month,one of the managers observes the drive-through process and collects a sample of 4 waiting times a day over a 6 day period.The data from one restaurant appears below.If DTG were to construct an X-bar chart from this data,the centerline would be

(Multiple Choice)
4.9/5
(41)

It is possible to have low variation within samples while at the same time having high variation between sample means.

(True/False)
4.7/5
(37)

Four common types of control charts include all of the following except:

(Multiple Choice)
4.7/5
(33)

Tolerances reflect the amount of common cause variation allowed in a process.

(True/False)
4.9/5
(40)

Dumplings -To-Go (DTG)provides take-out dumplings and noodle dishes to customers at its chain of drive-through restaurants.The target for a customer's waiting time is 3.0 minutes +/- 1 minute.Each month,one of the managers observes the drive-through process and collects a sample of 4 waiting times a day over a 6 day period.The data for one restaurant appears below.Calculate the process capability ratio.Is this restaurant capable of meeting DTG standards? Dumplings -To-Go (DTG)provides take-out dumplings and noodle dishes to customers at its chain of drive-through restaurants.The target for a customer's waiting time is 3.0 minutes +/- 1 minute.Each month,one of the managers observes the drive-through process and collects a sample of 4 waiting times a day over a 6 day period.The data for one restaurant appears below.Calculate the process capability ratio.Is this restaurant capable of meeting DTG standards?

(Multiple Choice)
4.9/5
(34)

When a control chart is first developed,if the process is found to be out of control,

(Multiple Choice)
4.8/5
(35)

A sequence of sample points that display a pattern is known as a run.

(True/False)
4.8/5
(33)

Easy Tax is a service company that prepares tax returns.An outside auditor has examined 20 samples each containing one completed tax return.The total number of defects observed over the 20 samples is 200.The standard deviation for the control chart is

(Multiple Choice)
5.0/5
(39)

All processes contain a certain amount of variation in their output.

(True/False)
4.8/5
(38)

Consider a production process that produces batteries.A quality engineer has taken 20 samples each containing 100 batteries.The total number of defective batteries observed over the 20 samples is 200.The centerline for the control chart constructed using z equal to two is

(Multiple Choice)
4.9/5
(35)

A company produces electronic components designed to have a collector-emitted voltage of 30 V (volts),with a tolerance of + 0.2 V.The production process has a standard deviation of 0.15 V and a process capability index of 0.4.Then the average collector-emitted voltage of the units produced is ______.

(Multiple Choice)
4.8/5
(33)

Process control is achieved by taking periodic samples from a process and plotting the sample points on a chart to determine if the process is within control limits.

(True/False)
4.8/5
(42)

Marble Inc.makes countertops from a variety of high-end materials.To monitor the quality of its production processes the company randomly selects one countertop and counts the number of blemishes.The results for ten samples are shown below: Marble Inc.makes countertops from a variety of high-end materials.To monitor the quality of its production processes the company randomly selects one countertop and counts the number of blemishes.The results for ten samples are shown below:   Given the sample information above,the UCL using sigma = 3 for this process would be Given the sample information above,the UCL using sigma = 3 for this process would be

(Multiple Choice)
4.7/5
(31)

Which of the following is not a primary purpose of statistical process control?

(Multiple Choice)
4.8/5
(32)

Consider a production process that produces batteries.A quality engineer has taken 20 samples each containing 100 batteries.The total number of defective batteries observed over the 20 samples is 200.The LCL for the control chat constructed using two sigma is

(Multiple Choice)
4.8/5
(35)

A company randomly selects 100 light bulbs every day for 40 days from its production process.If 600 defective light bulbs are found in the sampled bulbs then the estimate for the average percent defective would be

(Multiple Choice)
4.7/5
(36)

XYZ manufacturing has received an order to produce a rod 5 inches in diameter + .04 inch.In sample runs,the machine tool that will be making the rod has been able to produce rods with a mean diameter of 4.99 inches and a standard deviation of 0.011 inch.Which of the following statements is true?

(Multiple Choice)
4.9/5
(32)
Showing 81 - 100 of 103
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)