Exam 4: Statistical Process Control
Exam 1: Introduction to Operations and Supply Chain Management79 Questions
Exam 2: Supplement Operational Decision-Making Tools: Decision Analysis43 Questions
Exam 3: Quality Management91 Questions
Exam 4: Statistical Process Control103 Questions
Exam 5: Supplement Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 6: Product Design86 Questions
Exam 7: Service Design77 Questions
Exam 8: Processes and Technology47 Questions
Exam 9: Capacity and Facilities90 Questions
Exam 10: Supplement Operational Decision-Making Tools: Facility Location Models22 Questions
Exam 11: Human Resources90 Questions
Exam 12: Supplement Operational Decision-Making Tools: Work Measurement26 Questions
Exam 13: Project Management98 Questions
Exam 14: Supply Chain Management Strategy and Design73 Questions
Exam 15: Global Supply Chain Procurement and Distribution86 Questions
Exam 16: Supplement Operational Decision-Making Tools: Transportation and Transshipment Models28 Questions
Exam 17: Forecasting94 Questions
Exam 18: Inventory Management93 Questions
Exam 19: Supplement Operational Decision-Making Tools: Simulation25 Questions
Exam 20: Sales and Operations Planning85 Questions
Exam 21: Supplement Operational Decision-Making Tools: Linear Programming38 Questions
Exam 22: Enterprise Resource Planning92 Questions
Exam 23: Lean Systems86 Questions
Exam 24: Scheduling99 Questions
Select questions type
Easy Tax is a service company that prepares tax returns.An outside auditor has examined 20 samples each containing one completed tax return.The total number of defects observed over the 20 samples is 200.The UCL for the control chart constructed using three sigma is
(Multiple Choice)
4.8/5
(33)
Consider a production process that produces batteries.A quality engineer has taken 20 samples each containing 100 batteries.The total number of defective batteries observed over the 20 samples is 200.The sample standard deviation is
(Multiple Choice)
4.9/5
(35)
Two types of variation associated with the output of a process are common cause (random)and special cause (nonrandom).
(True/False)
5.0/5
(31)
Attribute control charts are used to monitor descriptive characteristics of the output of a process rather than measurable characteristics.
(True/False)
4.7/5
(29)
Which of the following could be responsible for variability that is special cause (nonrandom)?
(Multiple Choice)
4.8/5
(30)
Which of the following control charts are often based on sample sizes equal to or larger than one hundred?
(Multiple Choice)
4.8/5
(32)
Consider a production process that produces batteries.A quality engineer has taken 20 samples each containing 100 batteries.The total number of defective batteries observed over the 20 samples is 200.The UCL for the control chart constructed using two sigma is
(Multiple Choice)
4.8/5
(22)
Which of the following services can be measured and monitored with control charts?
(Multiple Choice)
4.7/5
(47)
XYZ manufacturing has received an order to produce a rod 5 inches in diameter + .04 inch.In sample runs,the machine tool that will be making the rod has been able to produce rods with a mean diameter of 4.99 inches and a standard deviation of 0.011 inch.The process capability index for this process is
(Multiple Choice)
4.8/5
(38)
Consider a production process that produces tires.A quality engineer has taken 15 samples,each containing 200 tires.The total number of defective tires over the 15 samples is 340.The UCL for the control chart constructed using two sigma is
(Multiple Choice)
4.9/5
(35)
Which of the following control charts is used to monitor the percent of defective items within a sample?
(Multiple Choice)
4.9/5
(31)
Control limits are based on the special cause (nonrandom)variation inherent in a process.
(True/False)
4.8/5
(38)
Tolerances or specification limits are allowable variation prescribed in a product design.
(True/False)
4.8/5
(36)
The range measures the variation within samples versus the variation between samples.
(True/False)
4.7/5
(35)
A company produces a product which is designed to weigh 10 oz. ,with a tolerance of + 0.5 oz.The process produces products with an average weight of 9.95 oz.and a standard deviation of 0.10 oz.According to the process capability index
(Multiple Choice)
4.8/5
(28)
A control chart that uses the actual number of defects per item to monitor a process is known as a
(Multiple Choice)
4.8/5
(30)
If the quality of a process's output is determined by classifying the output as being defective or not defective,use a(n)________control chart.
(Multiple Choice)
4.8/5
(38)
When constructing a control chart for the first time,all points should be within the control limits indicating the process is in control.
(True/False)
4.8/5
(41)
Consider a production process that produces tires.A quality engineer has taken 15 samples,each containing 200 tires.The total number of defective tires over the 15 samples is 340.The sample standard deviation is
(Multiple Choice)
4.7/5
(39)
The formula used to determine the upper and lower control limits are based on product specification limits.
(True/False)
4.8/5
(32)
Showing 41 - 60 of 103
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)