Exam 2: Basic Cost Management Concepts
Exam 1: Introduction to Cost Management151 Questions
Exam 2: Basic Cost Management Concepts199 Questions
Exam 3: Cost Behavior193 Questions
Exam 4: Activity-Based Costing198 Questions
Exam 5: Product and Service Costing: Job-Order System149 Questions
Exam 6: Process Costing181 Questions
Exam 7: Allocating Costs of Support Departments and Joint Products171 Questions
Exam 8: Budgeting for Planning and Control202 Questions
Exam 9: Standard Costing: a Functional-Based Control Approach125 Questions
Exam 10: Decentralization: Responsibility, Accounting, Performance Evaluation, and Transfer Pricing134 Questions
Exam 11: Strategic Cost Management148 Questions
Exam 12: Activity-Based Management146 Questions
Exam 13: The Balanced Scorecard: Strategic-Based Control124 Questions
Exam 14: Quality and Environmental Cost Management199 Questions
Exam 15: Lean Accounting and Productivity Measurement161 Questions
Exam 16: Cost-Volume-Profit Analysis128 Questions
Exam 17: Activity Resource Usage Model and Tactical Decision Making121 Questions
Exam 18: Pricing and Profitability Analysis159 Questions
Exam 19: Capital Investment125 Questions
Exam 20: Inventory Management: Economic Order Quantity, Jit, and the Theory of Constraints127 Questions
Select questions type
The sum of direct labor and factory overhead is referred to as
(Multiple Choice)
4.8/5
(45)
Work in process consists of all partially completed units found in production at a given point in time.
(True/False)
4.8/5
(42)
The most likely method to assign the cost of an assembly-line supervisor when the assembly line is the cost object is the:
(Multiple Choice)
4.9/5
(31)
When calculating the absorption-costing income for external reporting, all
(Multiple Choice)
4.9/5
(33)
Assume the following data for Rodriguez Services, an accounting firm, for November: 

(Not Answered)
This question doesn't have any answer yet
In a functional-based management system, one is NOT likely to find
(Multiple Choice)
4.8/5
(39)
The cost management subsystem designed to provide accurate and timely feedback concerning the performance of managers relative to their control of activities is the information system.
(Short Answer)
4.8/5
(30)
Which of the following methods of assigning costs is based on convenience or some assumed linkage, and reduces the overall accuracy of the cost assignments?
(Multiple Choice)
4.8/5
(33)
In a cost management system, the process view does NOT include
(Multiple Choice)
4.8/5
(23)
Which of the following costs incurred by a bus manufacturer would NOT be directly attributable to the finished product?
(Multiple Choice)
4.9/5
(42)
In an accounting information system, which of the following is NOT a transformation process?
(Multiple Choice)
4.9/5
(41)
The resources given up that are expected to bring a current or future benefit to the organization are represented by:
(Multiple Choice)
4.9/5
(25)
The records for the previous year for Sarasota Boat Builders, Inc., shows the following data::
The cost of goods sold is

(Multiple Choice)
4.8/5
(36)
Services differ from tangible products on three dimension: intangibility, perishability, and inseparability.
(True/False)
4.8/5
(40)
Which of the following costs would NOT be included in calculating inventory values under the absorption-costing basis?
(Multiple Choice)
4.7/5
(24)
A subsystem of the accounting information system designed to satisfy costing, controlling and decision making objectives is called the system.
(Short Answer)
4.9/5
(39)
Showing 21 - 40 of 199
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)