Exam 12: Activity-Based Management
Exam 1: Introduction to Cost Management151 Questions
Exam 2: Basic Cost Management Concepts199 Questions
Exam 3: Cost Behavior193 Questions
Exam 4: Activity-Based Costing198 Questions
Exam 5: Product and Service Costing: Job-Order System149 Questions
Exam 6: Process Costing181 Questions
Exam 7: Allocating Costs of Support Departments and Joint Products171 Questions
Exam 8: Budgeting for Planning and Control202 Questions
Exam 9: Standard Costing: a Functional-Based Control Approach125 Questions
Exam 10: Decentralization: Responsibility, Accounting, Performance Evaluation, and Transfer Pricing134 Questions
Exam 11: Strategic Cost Management148 Questions
Exam 12: Activity-Based Management146 Questions
Exam 13: The Balanced Scorecard: Strategic-Based Control124 Questions
Exam 14: Quality and Environmental Cost Management199 Questions
Exam 15: Lean Accounting and Productivity Measurement161 Questions
Exam 16: Cost-Volume-Profit Analysis128 Questions
Exam 17: Activity Resource Usage Model and Tactical Decision Making121 Questions
Exam 18: Pricing and Profitability Analysis159 Questions
Exam 19: Capital Investment125 Questions
Exam 20: Inventory Management: Economic Order Quantity, Jit, and the Theory of Constraints127 Questions
Select questions type
What is Kaizen costing? How does activity analysis help reduce costs?
(Essay)
4.8/5
(47)
Goodyear,, Inc., has developed ideal standards for four activities: labor, materials, inspection, and receiving. Information is as follows:
The actual prices paid per unit of each activity driver were equal to the standard prices.
Required:
Complete the following cost report.



(Essay)
4.9/5
(36)
Bandolero Corporation has developed ideal standards for four activities: labor, materials, inspection, and receiving. Information is as follows:
The actual prices paid per unit of each activity driver were equal to the standard prices. The value-added costs for
Labor are

(Multiple Choice)
4.7/5
(36)
For non-value-added activities that are unnecessary, the standard quantity is
(Multiple Choice)
4.7/5
(39)
One of the major reasons for the failure of ABM is lack of upper management support.
(True/False)
4.9/5
(37)
Implementing an activity-based management requires careful planning and execution.
(True/False)
4.8/5
(37)
Mattison Company has developed cost formulas for the drivers of the following production activities:
If the actual activity was 20 setups and the actual fixed cost for inspections was $28,000 and the variable cost for
Inspections was $5,000, the total variance for inspections is due to

(Multiple Choice)
4.9/5
(43)
Identifying, defining, and classifying activities require more attention for ABC than ABM.
(True/False)
4.9/5
(38)
A technique for improving performance of activities and processes that searches for best practices is called
(Multiple Choice)
4.9/5
(41)
The process which involves choosing among various sets of activities that are caused by competing strategies.
(Multiple Choice)
4.8/5
(44)
Activities that contribute to customer value and are necessary to remain in business are called activities.
(Short Answer)
4.8/5
(36)
Each unit of product requires 16 pounds of material. Due to scrap and rework, each unit has been averaging 18 pounds of material. The material costs $4 per pound. The non-value-added costs are
(Multiple Choice)
4.7/5
(46)
Livingston Company has developed capacity standards. Information about a non-value-added activity is as follows: Standard cost of the activity capacity acquired $60,000 Standard cost of the activity capacity used -0-
Standard cost of the actual activity used 50,000
The volume variance is
(Multiple Choice)
4.7/5
(35)
Process improvement refers to incremental and erratic increases in the efficiency of an existing process.
(True/False)
4.8/5
(35)
Which of the following process dimensions of the activity-based management model deals with "what"?
(Multiple Choice)
4.7/5
(43)
A well accepted approach for reducing costs by eliminating waste is called costing.
(Short Answer)
4.7/5
(36)
Which of the following is an example of a non-value-added manufacturing activity?
(Multiple Choice)
4.8/5
(43)
Which of the following is NOT part of the cost dimension of the activity-based management model?
(Multiple Choice)
4.9/5
(28)
Showing 61 - 80 of 146
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)