Exam 12: Activity-Based Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

What is Kaizen costing? How does activity analysis help reduce costs?

(Essay)
4.8/5
(47)

Goodyear,, Inc., has developed ideal standards for four activities: labor, materials, inspection, and receiving. Information is as follows: Goodyear,, Inc., has developed ideal standards for four activities: labor, materials, inspection, and receiving. Information is as follows:    The actual prices paid per unit of each activity driver were equal to the standard prices. Required: Complete the following cost report.   The actual prices paid per unit of each activity driver were equal to the standard prices. Required: Complete the following cost report. Goodyear,, Inc., has developed ideal standards for four activities: labor, materials, inspection, and receiving. Information is as follows:    The actual prices paid per unit of each activity driver were equal to the standard prices. Required: Complete the following cost report.

(Essay)
4.9/5
(36)

Bandolero Corporation has developed ideal standards for four activities: labor, materials, inspection, and receiving. Information is as follows: Bandolero Corporation has developed ideal standards for four activities: labor, materials, inspection, and receiving. Information is as follows:   The actual prices paid per unit of each activity driver were equal to the standard prices. The value-added costs for Labor are The actual prices paid per unit of each activity driver were equal to the standard prices. The value-added costs for Labor are

(Multiple Choice)
4.7/5
(36)

For non-value-added activities that are unnecessary, the standard quantity is

(Multiple Choice)
4.7/5
(39)

One of the major reasons for the failure of ABM is lack of upper management support.

(True/False)
4.9/5
(37)

Which of the following is a value-added activity?

(Multiple Choice)
4.8/5
(37)

Reducing non-value added costs decreases activity deficiency.

(True/False)
4.8/5
(41)

Implementing an activity-based management requires careful planning and execution.

(True/False)
4.8/5
(37)

Mattison Company has developed cost formulas for the drivers of the following production activities: Mattison Company has developed cost formulas for the drivers of the following production activities:   If the actual activity was 20 setups and the actual fixed cost for inspections was $28,000 and the variable cost for Inspections was $5,000, the total variance for inspections is due to If the actual activity was 20 setups and the actual fixed cost for inspections was $28,000 and the variable cost for Inspections was $5,000, the total variance for inspections is due to

(Multiple Choice)
4.9/5
(43)

Identifying, defining, and classifying activities require more attention for ABC than ABM.

(True/False)
4.9/5
(38)

A technique for improving performance of activities and processes that searches for best practices is called

(Multiple Choice)
4.9/5
(41)

The process which involves choosing among various sets of activities that are caused by competing strategies.

(Multiple Choice)
4.8/5
(44)

Activities that contribute to customer value and are necessary to remain in business are called activities.

(Short Answer)
4.8/5
(36)

Each unit of product requires 16 pounds of material. Due to scrap and rework, each unit has been averaging 18 pounds of material. The material costs $4 per pound. The non-value-added costs are

(Multiple Choice)
4.7/5
(46)

Livingston Company has developed capacity standards. Information about a non-value-added activity is as follows: Standard cost of the activity capacity acquired $60,000 Standard cost of the activity capacity used -0- Standard cost of the actual activity used 50,000 The volume variance is

(Multiple Choice)
4.7/5
(35)

Process improvement refers to incremental and erratic increases in the efficiency of an existing process.

(True/False)
4.8/5
(35)

Which of the following process dimensions of the activity-based management model deals with "what"?

(Multiple Choice)
4.7/5
(43)

A well accepted approach for reducing costs by eliminating waste is called costing.

(Short Answer)
4.7/5
(36)

Which of the following is an example of a non-value-added manufacturing activity?

(Multiple Choice)
4.8/5
(43)

Which of the following is NOT part of the cost dimension of the activity-based management model?

(Multiple Choice)
4.9/5
(28)
Showing 61 - 80 of 146
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)