Multiple Choice
The following information is the basis for the next three questions.
Jim and Carol Spalding have a crack in their waterline and need to replace it. This will require digging up the water line, replacing it, filling the hole, leveling the soil, and re-seeding the grass. The Spalding's plumber suggests that, since they have the well dug up, they should replace the foot valve in the well also. Below are the plumber's estimates of the time in hours) necessary to perform each of the activities required.
-The plumber has scheduled another small job at 6:00 p.m. If it takes 1/2 hour to drive from the Spalding's to the other job, what is the probability the plumber will be able to make the 6:00 p.m. appointment on time?
A) 63%
B) 75%
C) 89%
D) 95%
E) 99%
Correct Answer:

Verified
Correct Answer:
Verified
Q1: The following software development plan is the
Q3: Based on the table in the previous
Q4: Which of the following is an example
Q5: Which of the following types of precedence
Q6: The following network is the basis for
Q7: For the next two questions, refer to
Q8: A project team estimates that a work
Q9: Which of the following is NOT a
Q10: For the next two questions, refer to
Q11: The following software development plan is the