Exam 8: Cost Estimation and Budgeting
Exam 1: Introduction: Why Project Management105 Questions
Exam 2: The Organizational Context: Strategy, structure, and Culture106 Questions
Exam 3: Project Selection and Portfolio Management116 Questions
Exam 4: Leadership and the Project Manager130 Questions
Exam 5: Scope Management116 Questions
Exam 6: Project Team Building, conflict, and Negotiation123 Questions
Exam 7: Risk Management114 Questions
Exam 8: Cost Estimation and Budgeting114 Questions
Exam 9: Project Scheduling: Networks, duration Estimation, and Critical Path118 Questions
Exam 10: Project Scheduling: Lagging, crashing, and Activity Networks110 Questions
Exam 11: Critical Chain Project Scheduling117 Questions
Exam 12: Resource Management93 Questions
Exam 13: Project Evaluation and Control117 Questions
Exam 14: Project Closeout and Termination120 Questions
Select questions type
Big Mike has to prepare a bid for the swimming pools to be placed in every backyard in a new housing addition.Each swimming pool represents only a slight variation on the other,so there is a good opportunity to leverage learning effects in the bid process.A swimming pool installation can be broken down into four major steps: excavation,concrete,plumbing,and finish work.Mike has found the best contractors and asks each of them how long it will take to complete work on the first pool and what their learning rates are.Amazingly,each contractor is intimately familiar with learning curve theory and knows what his learning rate is for this type of work.This information is summarized in the table.
How long will it take to complete the 25th pool for the subdivision?
How long will it take to complete all 25 pools for the subdivision?

(Essay)
4.8/5
(45)
________ begins with the work packages of the work breakdown structure and specifies funds that are needed to support the tasks.These costs are aggregated by managers and duplicate costs are removed as managers' budgets are combined.
(Essay)
4.8/5
(34)
Activity-based costing is a budgeting method that identifies ________ associated with activities that consume resources.
(Essay)
4.9/5
(42)
Top-down budgeting,where input is gathered directly from the organization's top management,is often quite accurate.
(True/False)
4.9/5
(37)
An order of magnitude estimate is usually more accurate than a ballpark estimate.
(True/False)
4.7/5
(37)
A learning rate of 90% means that for every doubling of output,the time required by the activity falls by 10%.
(True/False)
4.8/5
(37)
Input is received from an organization's management to create a project budget in:
(Multiple Choice)
5.0/5
(39)
Every morning I stumble into the office,turn on the lights and brew a pot of coffee.Sometimes that's all I do and other days I accomplish a great deal.The coffee and light expenses should be classified as ________ costs.
(Essay)
4.9/5
(37)
Consultations with a client cost $50 and copying a page costs $1.Once we know how many consultations and copies are needed,we can estimate the cost of the divorce project thanks to our ________ approach to budgeting.
(Essay)
4.8/5
(40)
Unplanned costs incurred when steps are taken to speed up the project's completion are ________.
(Essay)
4.8/5
(30)
What is the total project budget for design in this time-phased budget? 

(Multiple Choice)
4.8/5
(38)
Workers paid $15.00 per hour with an overhead charge of 1.45 and a personal time allowance of 1.15,have what total direct labor cost for an 8-hour work day?
(Multiple Choice)
4.9/5
(45)
An allocation of extra funds to cover uncertainties and improve chances that the project can be completed within the timeframe originally specified is a:
(Multiple Choice)
4.7/5
(41)
It took 80 hours of analysis to complete the first phase,but the second phase was done in 74 hours.If this learning rate continues,then the 8th analysis should take a mere:
(Multiple Choice)
4.8/5
(40)
The gentleman farmer and surrealist aficionado commissioned a mural on barn that was an homage to Salvador Dalí's Persistence of Memory with a few farm animals included.The project would require the services of a senior muralist,a junior muralist,and a gofer.The senior muralist has an annual salary of $120,000,the junior muralist draws an annual salary of $75,000,and the gofer makes $30,000 per year.It is anticipated that the project will require 25 hours of senior muralist time,40 hours of junior muralist time,and 60 hours of gofer time.Overhead charges vary by position;the gofer has a lower overhead rate (30%)than the two muralist positions (50%).Use 2080 hours as an estimate for the number of hours in a year and a 15% factor for personal time.What is the total direct labor cost for the project?
(Essay)
4.8/5
(33)
If it takes 50 hours to complete the first unit and the company knows from experience that the learning rate should be 0.85,how fast can they be expected to finish all ten units?
(Multiple Choice)
4.8/5
(46)
Which of the following is NOT contained in a typical time-phased budget?
(Multiple Choice)
4.7/5
(29)
What is the total project budget in this time-phased budget? 

(Multiple Choice)
4.8/5
(39)