Exam 8: Cost Estimation and Budgeting
Exam 1: Introduction: Why Project Management105 Questions
Exam 2: The Organizational Context: Strategy, structure, and Culture106 Questions
Exam 3: Project Selection and Portfolio Management116 Questions
Exam 4: Leadership and the Project Manager130 Questions
Exam 5: Scope Management116 Questions
Exam 6: Project Team Building, conflict, and Negotiation123 Questions
Exam 7: Risk Management114 Questions
Exam 8: Cost Estimation and Budgeting114 Questions
Exam 9: Project Scheduling: Networks, duration Estimation, and Critical Path118 Questions
Exam 10: Project Scheduling: Lagging, crashing, and Activity Networks110 Questions
Exam 11: Critical Chain Project Scheduling117 Questions
Exam 12: Resource Management93 Questions
Exam 13: Project Evaluation and Control117 Questions
Exam 14: Project Closeout and Termination120 Questions
Select questions type
What learning rate is being demonstrated if the first unit takes 25 hours and the fourth unit takes 22 hours to complete?
(Multiple Choice)
4.8/5
(33)
Estimates based on the assumption that historical data can be used as a frame of reference for current estimates are:
(Multiple Choice)
4.8/5
(36)
Once most of the design work is complete,at a point when the scope and capabilities of the project are quite well understood,a ________ may be developed.
(Multiple Choice)
4.9/5
(42)
What is a time-phased budget and how does it help a project manager control costs?
(Essay)
4.8/5
(34)
How are top-down and bottom-up budgets created? What advantages does each approach hold over the other?
(Essay)
4.9/5
(37)
A time-phased budget allocates costs across both project activities and the anticipated time in which the budget is to be expended.
(True/False)
4.8/5
(38)
After years of tinkering and reverse engineering initiatives,Kimray had finally unlocked the secrets of the Beta tape format.A quick trip to the rental store was an epiphany for company leadership when they realized that only a handful of Beta tapes were available;the rest of the world had adopted the VHS format seemingly overnight.Now they would have to buy a few of those newfangled VHS machines to see how they ticked.The contingency funds that management had set aside would be put to good use on this:
(Multiple Choice)
4.9/5
(34)
When their baby was ready to head off to college,the beleaguered parents pulled out the college folder from their file cabinet and added up the cost of putting their first child through college from 1995-2000.The mother whimpered as she factored in the rising cost of tuition,fees,books,and inflation by multiplying the total by 2.5.The father felt a searing pain go through his chest as he saw the total,knowing full well that their cost estimation approach,called:
(Multiple Choice)
4.9/5
(33)
What is the total project budget in this time-phased budget? 

(Multiple Choice)
5.0/5
(41)
Three workers complete a full 8-hour day finishing concrete for a terrace.All three workers are paid $12 an hour and the job bills to the customer for $450.What are the total direct labor costs?
(Multiple Choice)
4.8/5
(33)
Which worker's wages would constitute a direct cost for a construction project?
(Multiple Choice)
4.9/5
(40)
The term expedited cost has the same meaning as crashing cost in the project management milieu.
(True/False)
4.8/5
(39)
________ is typically added to the project's budget following the identification of all project costs;that is,the project does not include ________ as part of the activity-based costing process.
(Essay)
4.9/5
(35)
An early warning signal for the potential of an overdrawn budget is created when:
(Multiple Choice)
4.9/5
(30)
When asked to provide an estimate of an irrigation system,Pete looked from one end of the field to the other,licked a finger and held it in the air,squinted into the sun and said $25,000,give or take 30%.The technique employed for cost estimation is:
(Multiple Choice)
4.9/5
(37)
Function point analysis is a system for estimating the size of software projects based on the number of lines of code a typical programmer can write in a day.
(True/False)
4.7/5
(39)
Poor initial scope development and work breakdown structure often creates cost overruns that are attributable to:
(Multiple Choice)
4.8/5
(34)
A contingency rate of 10% on a building project budgeted at $20 million means the project organization is hoping to bring the project in for around:
(Multiple Choice)
4.8/5
(28)