The Cp index measures the potential of a process, not its actual performance.

(True/False)
4.7/5
(29)

The cause of variation that can be reduced only by changing the system is ________ cause variation.

(Short Answer)
5.0/5
(30)

A process capability is estimated by the percentage of product or service that fall outside the specification limits.

(True/False)
4.8/5
(33)

TABLE 17-7 A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing process. She takes samples of size 5 from each day's output and counts the number of blemishes on each silicone sheet. The results from 20 days of such evaluations are presented below. TABLE 17-7 A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing process. She takes samples of size 5 from each day's output and counts the number of blemishes on each silicone sheet. The results from 20 days of such evaluations are presented below.    She also decides that the upper specification limit is 10 blemishes. -Referring to Table 17-7, an R chart is to be constructed for the number of blemishes. The lower control limit for this data set is ________. She also decides that the upper specification limit is 10 blemishes. -Referring to Table 17-7, an R chart is to be constructed for the number of blemishes. The lower control limit for this data set is ________.

(Short Answer)
4.9/5
(34)

TABLE 17-4 A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds) is too erratic and adversely affects expected profits. The supervisor proceeds by randomly sampling 5 individuals per hour for a period of 10 hours. The sample mean and range for each hour are listed below. TABLE 17-4 A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds) is too erratic and adversely affects expected profits. The supervisor proceeds by randomly sampling 5 individuals per hour for a period of 10 hours. The sample mean and range for each hour are listed below.    She also decides that lower and upper specification limit for the critical-to-quality variable should be 10 and 30 seconds, respectively. -Referring to Table 17-4, what percentage of the time it takes workers to complete an important production task will fall inside the specification limits? She also decides that lower and upper specification limit for the critical-to-quality variable should be 10 and 30 seconds, respectively. -Referring to Table 17-4, what percentage of the time it takes workers to complete an important production task will fall inside the specification limits?

(Short Answer)
4.8/5
(41)

TABLE 17-10 Below is the number of defective items from a production line over twenty consecutive morning shifts. TABLE 17-10 Below is the number of defective items from a production line over twenty consecutive morning shifts.    -Referring to Table 17-10, based on the c chart, it appears that the process is out of control. -Referring to Table 17-10, based on the c chart, it appears that the process is out of control.

(True/False)
4.8/5
(39)

Variation due to the inherent variability in a system of operation is called

(Multiple Choice)
4.8/5
(37)

Which of the following is a method for breaking process into a series of steps in order to eliminate defects and produce near perfect results?

(Multiple Choice)
4.8/5
(32)

TABLE 17-9 The manufacturer of cat food constructed control charts and analyzed several quality characteristics. One characteristic of interest is the weight of the filled cans. The lower specification limit for weight is 2.95 pounds. The table below provides the range and mean of the weights of five cans tested every fifteen minutes during a day's production. TABLE 17-9 The manufacturer of cat food constructed control charts and analyzed several quality characteristics. One characteristic of interest is the weight of the filled cans. The lower specification limit for weight is 2.95 pounds. The table below provides the range and mean of the weights of five cans tested every fifteen minutes during a day's production.    -Referring to Table 17-9, an R chart is to be constructed for the weight. One way to create the upper control limit involves multiplying the average of the sample ranges by D<sub>4</sub>. For this data set, the value of D<sub>4</sub> is ________. -Referring to Table 17-9, an R chart is to be constructed for the weight. One way to create the upper control limit involves multiplying the average of the sample ranges by D4. For this data set, the value of D4 is ________.

(Short Answer)
4.8/5
(39)

TABLE 17-5 A manufacturer of computer disks took samples of 240 disks on 15 consecutive days. The number of disks with bad sectors was determined for each of these samples. The results are in the table that follows. TABLE 17-5 A manufacturer of computer disks took samples of 240 disks on 15 consecutive days. The number of disks with bad sectors was determined for each of these samples. The results are in the table that follows.    -Referring to Table 17-5, a p control chart is to be made for these data. The estimate of the standard error of the proportion of disks with bad sectors is ________. -Referring to Table 17-5, a p control chart is to be made for these data. The estimate of the standard error of the proportion of disks with bad sectors is ________.

(Short Answer)
4.9/5
(28)

TABLE 17-8 Recently, a university switched to a new type of computer-based registration. The registrar is concerned with the amount of time students are spending on the computer registering under the new system. She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering. The range, mean, and standard deviation of the times required to register are in the table that follows. TABLE 17-8 Recently, a university switched to a new type of computer-based registration. The registrar is concerned with the amount of time students are spending on the computer registering under the new system. She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering. The range, mean, and standard deviation of the times required to register are in the table that follows.    -Referring to Table 17-8, an R chart is to be constructed for the time required to register. One way to create the upper control limit involves multiplying the average of the sample ranges by D<sub>4</sub>. For this data set, the value of D<sub>4</sub> is ________. -Referring to Table 17-8, an R chart is to be constructed for the time required to register. One way to create the upper control limit involves multiplying the average of the sample ranges by D4. For this data set, the value of D4 is ________.

(Short Answer)
4.9/5
(35)

The Shewhart-Deming cycle plays an important role in which of the following Deming's 14 points for management?

(Multiple Choice)
4.9/5
(33)

TABLE 17-3 A quality control analyst for a light bulb manufacturer is concerned that the time it takes to produce a batch of light bulbs is too erratic. Accordingly, the analyst randomly surveys 10 production periods each day for 14 days and records the sample mean and range for each day. TABLE 17-3 A quality control analyst for a light bulb manufacturer is concerned that the time it takes to produce a batch of light bulbs is too erratic. Accordingly, the analyst randomly surveys 10 production periods each day for 14 days and records the sample mean and range for each day.    -Referring to Table 17-3, suppose the analyst constructs an   chart to see if the production process is in-control. What is the lower control limit (LCL) for this chart? -Referring to Table 17-3, suppose the analyst constructs an TABLE 17-3 A quality control analyst for a light bulb manufacturer is concerned that the time it takes to produce a batch of light bulbs is too erratic. Accordingly, the analyst randomly surveys 10 production periods each day for 14 days and records the sample mean and range for each day.    -Referring to Table 17-3, suppose the analyst constructs an   chart to see if the production process is in-control. What is the lower control limit (LCL) for this chart? chart to see if the production process is in-control. What is the lower control limit (LCL) for this chart?

(Multiple Choice)
4.8/5
(35)

TABLE 17-8 Recently, a university switched to a new type of computer-based registration. The registrar is concerned with the amount of time students are spending on the computer registering under the new system. She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering. The range, mean, and standard deviation of the times required to register are in the table that follows. TABLE 17-8 Recently, a university switched to a new type of computer-based registration. The registrar is concerned with the amount of time students are spending on the computer registering under the new system. She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering. The range, mean, and standard deviation of the times required to register are in the table that follows.    -Referring to Table 17-8, an R chart is to be constructed for the time required to register. The upper control limit for this data set is ________. -Referring to Table 17-8, an R chart is to be constructed for the time required to register. The upper control limit for this data set is ________.

(Short Answer)
4.8/5
(28)

TABLE 17-3 A quality control analyst for a light bulb manufacturer is concerned that the time it takes to produce a batch of light bulbs is too erratic. Accordingly, the analyst randomly surveys 10 production periods each day for 14 days and records the sample mean and range for each day. TABLE 17-3 A quality control analyst for a light bulb manufacturer is concerned that the time it takes to produce a batch of light bulbs is too erratic. Accordingly, the analyst randomly surveys 10 production periods each day for 14 days and records the sample mean and range for each day.    -Referring to Table 17-3, suppose the analyst constructs an   chart to see if the production process is in-control. What is the center line for this chart? -Referring to Table 17-3, suppose the analyst constructs an TABLE 17-3 A quality control analyst for a light bulb manufacturer is concerned that the time it takes to produce a batch of light bulbs is too erratic. Accordingly, the analyst randomly surveys 10 production periods each day for 14 days and records the sample mean and range for each day.    -Referring to Table 17-3, suppose the analyst constructs an   chart to see if the production process is in-control. What is the center line for this chart? chart to see if the production process is in-control. What is the center line for this chart?

(Multiple Choice)
4.8/5
(43)

TABLE 17-5 A manufacturer of computer disks took samples of 240 disks on 15 consecutive days. The number of disks with bad sectors was determined for each of these samples. The results are in the table that follows. TABLE 17-5 A manufacturer of computer disks took samples of 240 disks on 15 consecutive days. The number of disks with bad sectors was determined for each of these samples. The results are in the table that follows.    -Referring to Table 17-5, construct a p control chart for these data. -Referring to Table 17-5, construct a p control chart for these data.

(Essay)
4.9/5
(20)

TABLE 17-4 A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds) is too erratic and adversely affects expected profits. The supervisor proceeds by randomly sampling 5 individuals per hour for a period of 10 hours. The sample mean and range for each hour are listed below. TABLE 17-4 A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds) is too erratic and adversely affects expected profits. The supervisor proceeds by randomly sampling 5 individuals per hour for a period of 10 hours. The sample mean and range for each hour are listed below.    She also decides that lower and upper specification limit for the critical-to-quality variable should be 10 and 30 seconds, respectively. -Referring to Table 17-4, suppose the supervisor constructs an R chart to see if the variability in collection times is in-control. What is the center line of this R chart? She also decides that lower and upper specification limit for the critical-to-quality variable should be 10 and 30 seconds, respectively. -Referring to Table 17-4, suppose the supervisor constructs an R chart to see if the variability in collection times is in-control. What is the center line of this R chart?

(Multiple Choice)
4.8/5
(32)

Which of the following is not part of the DMAIC process in Six Sigma management?

(Multiple Choice)
4.9/5
(43)

TABLE 17-7 A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing process. She takes samples of size 5 from each day's output and counts the number of blemishes on each silicone sheet. The results from 20 days of such evaluations are presented below. TABLE 17-7 A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing process. She takes samples of size 5 from each day's output and counts the number of blemishes on each silicone sheet. The results from 20 days of such evaluations are presented below.    She also decides that the upper specification limit is 10 blemishes. -Referring to Table 17-7, an   chart is to be used for the number of blemishes. The center line of this chart is located at ________. She also decides that the upper specification limit is 10 blemishes. -Referring to Table 17-7, an TABLE 17-7 A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing process. She takes samples of size 5 from each day's output and counts the number of blemishes on each silicone sheet. The results from 20 days of such evaluations are presented below.    She also decides that the upper specification limit is 10 blemishes. -Referring to Table 17-7, an   chart is to be used for the number of blemishes. The center line of this chart is located at ________. chart is to be used for the number of blemishes. The center line of this chart is located at ________.

(Short Answer)
4.8/5
(34)

TABLE 17-10 Below is the number of defective items from a production line over twenty consecutive morning shifts. TABLE 17-10 Below is the number of defective items from a production line over twenty consecutive morning shifts.    -Referring to Table 17-10, a c chart is to be constructed for the number of defective items. The upper control limit is ________. -Referring to Table 17-10, a c chart is to be constructed for the number of defective items. The upper control limit is ________.

(Short Answer)
4.8/5
(27)