Exam 12: Managing Systems Support and Security
Exam 1: Introduction to Systems Analysis and Design76 Questions
Exam 2: Analyzing the Business Case80 Questions
Exam 3: Managing Systems Projects80 Questions
Exam 4: Requirements Engineering79 Questions
Exam 5: Data and Process Modeling69 Questions
Exam 6: Object Modeling76 Questions
Exam 7: Development Strategies80 Questions
Exam 8: User Interface Design74 Questions
Exam 9: Data Design74 Questions
Exam 10: System Architecture80 Questions
Exam 11: Managing Systems Implementation74 Questions
Exam 12: Managing Systems Support and Security80 Questions
Exam 13: Communication-Tools45 Questions
Exam 14: Case-Tools45 Questions
Exam 15: Financial-Analysis-Tools45 Questions
Exam 16: Internet-Resource-Tools44 Questions
Select questions type
A _____ is responsible for assigning maintenance tasks to individuals or to a maintenance team.
(Multiple Choice)
4.8/5
(30)
_____ is the overall time between a request for system activity and the delivery of the response.
(Multiple Choice)
4.9/5
(27)
Many IT departments use a job title of _____ to designate positions that require a combination of systems analysis and programming skills.
(Multiple Choice)
4.9/5
(34)
_____ protects information from unauthorized disclosure and safeguards privacy.
(Multiple Choice)
4.9/5
(31)
In a broad sense,credentials include formal degrees,diplomas,or certificates granted by learning institutions to show that a certain level of education has been achieved.
(True/False)
4.9/5
(46)
_____ includes monitoring a system for signs of trouble,logging all system failures,diagnosing the problem,and applying corrective action.
(Multiple Choice)
4.8/5
(37)
A test site is an alternate IT location,anywhere in the world,that can support critical systems in the event of a power outage,system crash,or physical catastrophe.
(True/False)
4.8/5
(40)
Mitigation shifts the risk to another asset or party,such as an insurance company.
(True/False)
4.7/5
(38)
A _____ is a centralized resource staffed by IT professionals who provide users with the support they need to do their jobs.
(Multiple Choice)
4.9/5
(31)
_____ expenses vary significantly during a system's operational life and include spending to support maintenance activities.
(Multiple Choice)
4.8/5
(34)
In addition to benchmark testing,performance measurements,called _____,can monitor the number of transactions processed in a given time period,the number of records accessed,and the volume of online data.
(Multiple Choice)
4.9/5
(29)
_____ is a process for controlling changes in system requirements during software development.
(Multiple Choice)
4.9/5
(39)
When a new version of a system is installed,the prior release is _____,or stored.
(Multiple Choice)
4.7/5
(32)
_____ develops safeguards that reduce risks and their impact.
(Multiple Choice)
4.9/5
(33)
An incremental backup only includes recent files that have never been backed up by any method.
(True/False)
4.7/5
(32)
_____ costs include expenses for items such as supplies and equipment rental.
(Multiple Choice)
4.8/5
(42)
Acceptance means that nothing is done;companies usually accept a risk only when the protection clearly is not worth the expense.
(True/False)
4.8/5
(34)
A(n)_____ is an attack that takes advantage of a vulnerability.
(Multiple Choice)
4.8/5
(34)
A continuous backup only backs up files that are new or changed since the last full backup.
(True/False)
4.8/5
(30)
Showing 41 - 60 of 80
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)