Exam 11: Managing Systems Implementation
Exam 1: Introduction to Systems Analysis and Design76 Questions
Exam 2: Analyzing the Business Case80 Questions
Exam 3: Managing Systems Projects80 Questions
Exam 4: Requirements Engineering79 Questions
Exam 5: Data and Process Modeling69 Questions
Exam 6: Object Modeling76 Questions
Exam 7: Development Strategies80 Questions
Exam 8: User Interface Design74 Questions
Exam 9: Data Design74 Questions
Exam 10: System Architecture80 Questions
Exam 11: Managing Systems Implementation74 Questions
Exam 12: Managing Systems Support and Security80 Questions
Exam 13: Communication-Tools45 Questions
Exam 14: Case-Tools45 Questions
Exam 15: Financial-Analysis-Tools45 Questions
Exam 16: Internet-Resource-Tools44 Questions
Select questions type
Meshing is the process of turning program logic into specific instructions that the computer system can execute.
Free
(True/False)
4.8/5
(29)
Correct Answer:
False
Which is specified by the detailed procedures in a test plan?
Free
(Multiple Choice)
4.9/5
(33)
Correct Answer:
C
If modules are loosely coupled,one module is linked to internal logic contained in another module.
Free
(True/False)
4.8/5
(30)
Correct Answer:
False
Testing two or more programs that depend on each other is called _____.
(Multiple Choice)
4.7/5
(33)
Although programmers perform the actual coding,IT managers usually assign systems analysts to work with them as part of a team.
(True/False)
4.7/5
(39)
A _____ consists of related program code organized into small units that are easy to understand and maintain.
(Multiple Choice)
4.8/5
(37)
Many organizations require a more formal type of desk checking called _____.
(Multiple Choice)
4.7/5
(37)
In _____,two programmers work on the same task on the same computer;one drives while the other navigates.
(Multiple Choice)
4.7/5
(41)
System developers use _____ to document and trail program defects,code changes,and replacement code.
(Multiple Choice)
4.8/5
(34)
Successful completion of system testing is the key to user and management approval,which is why system tests sometimes are called _____.
(Multiple Choice)
4.8/5
(44)
The objective of _____ is to identify and eliminate execution errors that could cause a program to terminate abnormally,and logic errors that could have been missed during desk checking.
(Multiple Choice)
4.9/5
(35)
A class diagram includes the class _____,which describe the characteristics of objects in the class.
(Multiple Choice)
4.8/5
(26)
In a structure chart,a curved arrow represents a _____,which indicates that one or more modules are repeated.
(Multiple Choice)
4.9/5
(32)
The main objective of _____ is to avoid problems or to identify them as soon as possible.
(Multiple Choice)
4.8/5
(35)
The test environment for an information system contains copies of all programs,procedures,and test data files.
(True/False)
4.7/5
(36)
In a structure chart,a(n)_____ line,with a diamond on one end,indicates that a control module determines which subordinate modules will be invoked.
(Multiple Choice)
4.8/5
(31)
Showing 1 - 20 of 74
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)