Exam 11: Managing Systems Implementation

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

XP is an agile development method.

(True/False)
4.8/5
(36)

The environment for the actual system operation is called the _____.

(Multiple Choice)
4.8/5
(29)

Program documentation _____.

(Multiple Choice)
4.8/5
(32)

A kernel consists of related program code organized into small units that are easy to understand and maintain.

(True/False)
4.8/5
(39)

Critics of agile development often claim that because it focuses on quick iterations and fast releases,it lacks discipline and produces systems of questionable quality.

(True/False)
4.9/5
(39)

In sequence,the steps typically followed to create a structure chart are _____.

(Multiple Choice)
4.9/5
(29)

Using a _____ strategy,knowledgeable users can be selected who then conduct sessions for others.

(Multiple Choice)
4.8/5
(44)

Pseudocode is a technique for representing program logic.

(True/False)
4.9/5
(30)

After completing integration testing,a systems analyst must perform _____,which involves the entire information system and includes all typical processing situations.

(Multiple Choice)
4.8/5
(31)

Commercial software packages must undergo unit and integration testing similar to that of in-house developed systems,although system testing usually is not performed.

(True/False)
4.9/5
(25)

The skill set required to develop documentation usually is the same as that required to develop a system.

(True/False)
4.8/5
(46)

To minimize the need to require information from two different systems,cyclical information systems usually are converted using the direct cutover method at the beginning of a quarter,calendar year,or fiscal year.

(True/False)
5.0/5
(40)

In a structure chart,a control couple shows a message,also called a(n)_____,which one module sends to another.

(Multiple Choice)
4.9/5
(29)

The principles of cohesion and coupling do not apply to object-oriented application development.

(True/False)
5.0/5
(43)

Test data should contain only correct data.

(True/False)
4.9/5
(28)

The post-implementation evaluation of a system verifies that the new system meets specified requirements,complies with user objectives,and produces the anticipated benefits.

(True/False)
4.8/5
(39)

In a technique called _____,the programmer simulates each program outcome or result and displays a message to indicate whether or not the program executed successfully.

(Multiple Choice)
4.7/5
(33)

Language and grammar errors are referred to as script errors.

(True/False)
4.8/5
(33)

In addition to analyzing logic and program code,a project team usually holds a session with users,called a _____,to review the interface with a cross-section of people who will work with the new system and ensure that all the necessary features have been included.

(Multiple Choice)
4.9/5
(32)

Data conversion is easier when a new system replaces a manual system because all data can be entered manually,unless it must be scanned.

(True/False)
4.8/5
(38)
Showing 41 - 60 of 74
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)