Exam 18: Lean Operating Systems
Exam 1: Operations Management and Value Chains50 Questions
Exam 2: Measuring Performance in Operations and Value Chains35 Questions
Exam 3: Operations Strategy39 Questions
Exam 4: Technology and Operations Management25 Questions
Exam 5: Goods and Service Design40 Questions
Exam 6: Supply Chain Design33 Questions
Exam 7: Process Selection,design,and Improvement30 Questions
Exam 8: Facility and Work Design34 Questions
Exam 9: Forecasting and Demand Planning27 Questions
Exam 10: Capacity Management34 Questions
Exam 11: Process Analysis and Resource Utilization35 Questions
Exam 12: Managing Inventories in Supply Chains34 Questions
Exam 13: Supply Chain Management and Logistics28 Questions
Exam 14: Resource Management28 Questions
Exam 15: Operations Scheduling and Sequencing16 Questions
Exam 16: Quality Management38 Questions
Exam 17: Quality Control Spc34 Questions
Exam 18: Lean Operating Systems32 Questions
Exam 19: Project Management25 Questions
Select questions type
In the context of the 5S principles,_____ means to keep a process going through training,communication,and organizational structures.
Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
C
A _____ system produces finished-goods inventory in advance of customer demand using a forecast of sales.
Free
(Multiple Choice)
4.8/5
(32)
Correct Answer:
B
A company is using a Kanban system with 2 containers,each holding 50 parts,between a downstream (using)and an upstream (producing)work center.The using work center can handle 250 jobs per day.The average elapsed time for the entire cycle is currently 0.25 days.The company is concerned about the safety factor for the operation.Which of the following is the safety factor (α)of the current operation?
Free
(Multiple Choice)
4.8/5
(40)
Correct Answer:
B
A manufacturer of automobile engines is designing a new Kanban system for engine #321.The demand for #321 is 75 parts per day,and the container can hold 8 parts at a time.The total processing and waiting time is 3 days.The manager wants a safety factor (α)of 2 or 200 percent.How many Kanbans are required in this system?
(Multiple Choice)
4.9/5
(37)
Which of the following is true of a push manufacturing system?
(Multiple Choice)
4.9/5
(38)
In the context of the major categories of waste classified by the Toyota Motor Company,which of the following is true of overproduction?
(Multiple Choice)
4.9/5
(36)
Long setup times enable a manufacturer to have frequent changeovers and move toward single-piece flow,thus achieving high flexibility and product variety.
(True/False)
4.8/5
(35)
Lean Six Sigma focuses on real dollar savings and has the ability to make significant financial impacts on an organization.
(True/False)
4.7/5
(30)
In the context of the Toyota Motor Company's seven categories of waste,the result of not performing work correctly the first time is an example of _____.
(Multiple Choice)
4.8/5
(40)
_____ is one in which employees at a given operation go to the source of required parts,such as machining or subassembly,and withdraw the units as they need them.
(Multiple Choice)
4.8/5
(31)
Which of the following is a similarity between lean production and Six Sigma?
(Multiple Choice)
4.8/5
(39)
Create & Sell Manufacturing Inc.uses a Kanban system for a component.The daily demand is 175 units.Each container has a combined waiting and processing time of 0.20 days.If the container size is 10 brackets and the safety factor is 11 percent,how many Kanban card sets should be authorized?
(Multiple Choice)
4.8/5
(34)
Total productive maintenance (TPM)seeks to reduce worker ownership of production equipment by excluding employees from maintenance activities.
(True/False)
4.8/5
(34)
Lean operating systems value idle stock and extra storage because it eliminates wait times to replenish stock.
(True/False)
4.9/5
(41)
_____ is focused on ensuring that operating systems will perform their intended function reliably.
(Multiple Choice)
4.9/5
(35)
In the context of lean tools and approaches,_____ are indicators for operating activities that are placed in plain sight of all employees so that everyone can quickly and easily understand the status and performance of the work system.
(Multiple Choice)
4.8/5
(48)
Which of the following is a difference between lean production and Six Sigma?
(Multiple Choice)
4.8/5
(38)
The equation used to calculate the number of Kanban cards required in a system is ,where ? denotes _____.
(Multiple Choice)
4.9/5
(34)
A _____ is a flag or a piece of paper that contains all relevant information for an order,such as part number,description,process area used,time of delivery,quantity available,quantity delivered,production quantity,and so on.
(Multiple Choice)
4.7/5
(35)
Showing 1 - 20 of 32
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)