Exam 17: Quality Control Spc
Exam 1: Operations Management and Value Chains50 Questions
Exam 2: Measuring Performance in Operations and Value Chains35 Questions
Exam 3: Operations Strategy39 Questions
Exam 4: Technology and Operations Management25 Questions
Exam 5: Goods and Service Design40 Questions
Exam 6: Supply Chain Design33 Questions
Exam 7: Process Selection,design,and Improvement30 Questions
Exam 8: Facility and Work Design34 Questions
Exam 9: Forecasting and Demand Planning27 Questions
Exam 10: Capacity Management34 Questions
Exam 11: Process Analysis and Resource Utilization35 Questions
Exam 12: Managing Inventories in Supply Chains34 Questions
Exam 13: Supply Chain Management and Logistics28 Questions
Exam 14: Resource Management28 Questions
Exam 15: Operations Scheduling and Sequencing16 Questions
Exam 16: Quality Management38 Questions
Exam 17: Quality Control Spc34 Questions
Exam 18: Lean Operating Systems32 Questions
Exam 19: Project Management25 Questions
Select questions type
In the context of statistical process control and variation,if no special causes affect the output of a process,we say that the process is _____.
Free
(Multiple Choice)
4.8/5
(41)
Correct Answer:
C
The control limits represent the range between which all points are expected to fall if the process is in statistical control.
Free
(True/False)
4.8/5
(32)
Correct Answer:
True
Which of the following is the upper control limit for a c-chart (UCLc)with the average number of nonconformances per unit equal to 7?
Free
(Multiple Choice)
4.7/5
(43)
Correct Answer:
D
In the context of the net promoter score (NPS),which of the following is a difference between promoters and detractors?
(Multiple Choice)
4.9/5
(30)
A hotel chain periodically analyzes its service times to check for variation in service processes.To do this,it uses R-charts.Seven samples,each containing observed checkout time with three different customers,were collected.The average mean and the average range of the service times are found to be 9.924 and 0.957,respectively.If D4 for the R-chart is 1.924,the upper control limit (UCLR)for the R-chart will be:
(Multiple Choice)
4.8/5
(28)
Customer waiting time and order lead time are examples of _____ metrics.
(Multiple Choice)
5.0/5
(39)
Overadjusting a process that is in control will decrease the variation in the output.
(True/False)
4.8/5
(31)
In the context of designing control charts,which of the following is true of a sample size?
(Multiple Choice)
4.7/5
(35)
Designing control charts involves two key issues: sample size and sampling frequency.
(True/False)
4.9/5
(36)
Which of the following is the upper control limit for a c-chart (UCLc)with the average number of nonconformances per unit equal to 7?
(Multiple Choice)
4.8/5
(31)
When the _____ is extremely low,standard control charts are not effective.
(Multiple Choice)
4.9/5
(34)
In-process control is typically performed by people who run the back-end processes.
(True/False)
4.8/5
(41)
A process capability study is designed to yield specific information about _____.
(Multiple Choice)
4.9/5
(49)
Keeping special cause variation from occurring is the essence of statistical quality control.
(True/False)
4.9/5
(40)
In the context of the net promoter score (NPS),scores of 6 or below represent _____,unhappy customers who may spread negative comments.
(Multiple Choice)
4.8/5
(43)
If a process has a process capability index value (Cp)of less than 1,it means that:
(Multiple Choice)
4.9/5
(48)
An operator wants to determine the standard deviation for a machine she operates.To do this,she wants to create a p-chart.Over a month's time,she collects 30 samples of 75 observations each and records the number of errors.The average proportion defective is found to be 0.024.Which of the following is the standard deviation (s)of the machine?
(Multiple Choice)
4.7/5
(31)
A discrete metric is one that is calculated from data that are counted.