Exam 18: Lean Operating Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A hinge manufacturing company employs a Kanban system for a component part.The daily demand is 900 hinges.Each container has a waiting time of 0.05 days and a processing time of 0.37 days.The container size is 60 hinges,and the safety factor (α)is 10 percent.Given this data,the number of Kanbans necessary for the system is:

(Multiple Choice)
4.7/5
(32)

Drive-in-Style Motors follows a traditional manufacturing system.It produces a fixed number of cars every month.It is now planning to switch to a system of manufacturing where workers go to the source of required parts and withdraw them based on requirements.In this scenario,which of the following is most likely to occur if Drive-in-Style Motors implements this plan?

(Multiple Choice)
4.9/5
(29)

In the airline industry,short setup and turnaround time translates into _____.

(Multiple Choice)
4.9/5
(31)

In the context of Kanban systems,a withdrawal Kanban authorizes the gateway workstation to produce parts.

(True/False)
4.8/5
(40)

Any activity,material,or operation that does not add value in an organization is considered waste.

(True/False)
4.8/5
(32)

Which of the following is an example of waste in organizations?

(Multiple Choice)
4.9/5
(41)

In the context of the 5S principles,_____ means to arrange materials and equipment so that they are easy to find and use.

(Multiple Choice)
4.8/5
(40)

In the context of lean tools and approaches,_____,one of the components of the 5S principles,refers to a clean work area.

(Multiple Choice)
4.8/5
(43)

Quickly changing tooling and fixtures to reduce setup time and achieve higher flexibility and productivity is the principle of _____.

(Multiple Choice)
4.8/5
(31)

Which of the following is not true about lean principles?

(Multiple Choice)
4.9/5
(37)

In the context of the 5S principles,_____ refers to ensuring that each item in a workplace is in its proper place or identified as unnecessary and removed.

(Multiple Choice)
4.8/5
(42)

In the Timken company's bootcamp,employees and managers try to solve problems,such as removing non-value-added steps from processes to try to eliminate waste.

(True/False)
4.7/5
(40)
Showing 21 - 32 of 32
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)