Exam 3: Product and Process Design and Mapping
Exam 1: Introduction to Supply Chain and Operations Management89 Questions
Exam 2: Supply Chain and Operations Strategy71 Questions
Exam 3: Product and Process Design and Mapping84 Questions
Exam 4: Service Design97 Questions
Exam 5: Customer Relationship Management60 Questions
Exam 6: Strategic Sourcing78 Questions
Exam 7: Supplier Management64 Questions
Exam 8: Demand Management and Forecasting81 Questions
Exam 9: Inventory Management Fundamentals and Independent Demand84 Questions
Exam 10: Sales and Operations Planning and Enterprise Resource Planning115 Questions
Exam 11: Logistics86 Questions
Exam 12: Project Management90 Questions
Exam 13: Supply Chain Quality Management84 Questions
Exam 14: Statistical Process Control80 Questions
Exam 15: New Section76 Questions
Select questions type
A method for translating customer requirements into functional design is known as ________.
(Short Answer)
4.8/5
(38)
A manufacturer of detergent enhances their product offering by introducing new scents of their product.This is an example of which kind of R&D?
(Multiple Choice)
4.8/5
(37)
U-shaped production lines that are more efficient for low-volume production as compared to a job shop are known as flexible manufacturing systems.
(True/False)
4.8/5
(33)
Which option should be chosen if the expected demand is 5,000 units per month?
(Multiple Choice)
4.9/5
(33)
Use the information below to answer the following question(s).
A production line operates for 450 minutes per day.Desired production volume is 80 units per day.Total task time to make the product is 56 minutes.
-What is the minimum number of workstations required?
(Multiple Choice)
4.8/5
(38)
A production manager wants to design an assembly line that will turn out 800 widgets per day.There will be eight working hours in each day.What is the optimum cycle time?
(Multiple Choice)
4.7/5
(28)
Use the information below to answer the following question(s).
A production line operates for 450 minutes per day.Desired production volume is 80 units per day.Total task time to make the product is 56 minutes.
-What is the balance delay?
(Multiple Choice)
4.9/5
(34)
A schematic picture of a process using symbols is called a ________.
(Short Answer)
4.8/5
(38)
The "uptime" or proportion of time that a product or system functions properly is called ________.
(Short Answer)
4.9/5
(35)
The model used in designing functional layouts where movement is minimized is called the ________.
(Short Answer)
4.7/5
(30)
Applied research is practical exploration that often has a profit motive.
(True/False)
4.7/5
(31)
A manufacturer of light bulbs tests their products in a very rigorous manner to achieve 5000 hours of life,which is much higher than the industry standard.This is an example of
(Multiple Choice)
4.7/5
(34)
Layouts in which the product is stationary and equipment or machines are brought to the product is known as a ________.
(Short Answer)
4.9/5
(32)
A manufacturer of video game consoles introduces a new product in the market with new eye tracking sensor technology.This is an example of which kind of R&D?
(Multiple Choice)
5.0/5
(35)
The type of processing system which is used for highly standardized products is
(Multiple Choice)
4.9/5
(34)
Quality Function Deployment (QFD)is also known as house of quality.
(True/False)
4.8/5
(31)
The process of designing products that are complete changes from existing products is called continuous design.
(True/False)
4.9/5
(39)
Showing 61 - 80 of 84
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)