Exam 19: Linear Programming
Exam 1: Introduction to Operations Management78 Questions
Exam 2: Competitiveness, Strategy, and Productivity75 Questions
Exam 3: Forecasting144 Questions
Exam 4: Product and Service Design100 Questions
Exam 5: Strategic Capacity Planning for Products and Services210 Questions
Exam 6: Process Selection and Facility Layout137 Questions
Exam 7: Work Design and Measurement200 Questions
Exam 8: Location Planning and Analysis65 Questions
Exam 9: Management of Quality101 Questions
Exam 10: Quality Control117 Questions
Exam 11: Aggregate Planning and Master Scheduling80 Questions
Exam 12: Inventory Management134 Questions
Exam 13: MRP and ERP85 Questions
Exam 14: Jit and Lean Operations126 Questions
Exam 15: Supply Chain Management91 Questions
Exam 16: Scheduling102 Questions
Exam 17: Project Management118 Questions
Exam 18: Management of Waiting Lines68 Questions
Exam 19: Linear Programming98 Questions
Select questions type
The simplex method is a general-purpose LP algorithm that can be used for solving only problems with more than six variables.
(True/False)
4.8/5
(34)
Profit maximization could be an objective of an LP problem; but cost minimization cannot be the objective of an LP problem.
(True/False)
4.8/5
(31)
In the graphical approach to linear programming, finding values for the decision variables at the intersection of corners requires the solving of
(Multiple Choice)
4.8/5
(31)
_______________ represent choices available to the decision maker in terms of the amounts of either inputs or outputs.
(Multiple Choice)
4.8/5
(34)
What combination of x and y will provide a minimum for this problem?


(Multiple Choice)
4.9/5
(32)
Once we go beyond two decision variables, typically the ___________ method of linear programming must be used.
(Multiple Choice)
4.7/5
(32)
The term range of feasibility refers to coefficients of the objective function.
(True/False)
4.8/5
(38)
The region which satisfies all of the constraints in graphical linear programming is called the
(Multiple Choice)
4.9/5
(33)
The feasible solution space only contains points that satisfy all constraints.
(True/False)
4.7/5
(33)
An electronics firm produces two models of pocket calculators: the A-100 (A), which is an inexpensive four-function calculator, and the B-200 (B), which also features square root and percent functions. Each model uses one (the same)circuit board, of which there are only 2,500 available for this week's production. Also, the company has allocated a maximum of 800 hours of assembly time this week for producing these calculators, of which the A-100 requires 15 minutes (.25 hours)each, and the B-200 requires 30 minutes (.5 hours)each to produce. The firm forecasts that it could sell a maximum of 4,000 A-100s this week and a maximum of 1,000 B-200s. Profits for the A-100 are $1.00 each, and profits for the B-200 are $4.00 each. Which of the following is not a feasible production/sales combination?
(Multiple Choice)
4.8/5
(27)
The production planner for Fine Coffees, Inc., produces two coffee blends: American (A)and British (B). Two of his resources are constrained: Columbia beans, of which he can get at most 300 pounds (4,800 ounces)per week; and Dominican beans, of which he can get at most 200 pounds (3,200 ounces)per week. Each pound of American blend coffee requires 12 ounces of Colombian beans and 4 ounces of Dominican beans, while a pound of British blend coffee uses 8 ounces of each type of bean. Profits for the American blend are $2.00 per pound, and profits for the British blend are $1.00 per pound.
What is the objective function?
(Multiple Choice)
4.9/5
(36)
The logistics/operations manager of a mail order house purchases two products for resale: king beds (K)and queen beds (Q). Each king bed costs $500 and requires 100 cubic feet of storage space, and each queen bed costs $300 and requires 90 cubic feet of storage space. The manager has $75,000 to invest in beds this week, and her warehouse has 18,000 cubic feet available for storage. Profit for each king bed is $300 and for each queen bed is $150.
Which of the following is not a feasible purchase combination?
(Multiple Choice)
4.7/5
(32)
In graphical linear programming, when the objective function is parallel to one of the binding constraints, then
(Multiple Choice)
4.9/5
(42)
Graphical linear programming can handle problems that involve any number of decision variables.
(True/False)
4.8/5
(36)
Coordinates of all corner points are substituted into the objective function when we use the approach called
(Multiple Choice)
4.9/5
(36)
A maximization problem is limited by all greater than or equal to constraints.
(True/False)
4.9/5
(40)
For a linear programming problem with the following constraints, which point is in the feasible solution space assuming this is a maximization problem?


(Multiple Choice)
4.8/5
(34)
A shadow price reflects which of the following in a maximization problem?
(Multiple Choice)
4.9/5
(36)
The owner of Crackers, Inc., produces two kinds of crackers: Deluxe (D)and Classic (C). She has a limited amount of the three ingredients used to produce these crackers available for her next production run: 4,800 ounces of sugar; 9,600 ounces of flour, and 2,000 ounces of salt. A box of Deluxe crackers requires 2 ounces of sugar, 6 ounces of flour, and 1 ounce of salt to produce; while a box of Classic crackers requires 3 ounces of sugar, 8 ounces of flour, and 2 ounces of salt. Profits for a box of Deluxe crackers are $.40; and for a box of Classic crackers, $.50.
What is the objective function?
(Multiple Choice)
4.8/5
(30)
The logistics/operations manager of a mail order house purchases two products for resale: king beds (K)and queen beds (Q). Each king bed costs $500 and requires 100 cubic feet of storage space, and each queen bed costs $300 and requires 90 cubic feet of storage space. The manager has $75,000 to invest in beds this week, and her warehouse has 18,000 cubic feet available for storage. Profit for each king bed is $300 and for each queen bed is $150.
What is the maximum profit?
(Multiple Choice)
4.8/5
(35)
Showing 21 - 40 of 98
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)