The term pegging refers to identifying the parent items that have generated a given set of material requirements for a part or subassembly.

Free
(True/False)
4.7/5
(33)
Correct Answer:
Verified

True

Backflushing takes place

Free
(Multiple Choice)
4.7/5
(24)
Correct Answer:
Verified

C

The MRP input stating which end items are to be produced, when they are needed, and what quantities are needed, is the

Free
(Multiple Choice)
4.9/5
(34)
Correct Answer:
Verified

A

Refer to this product tree Refer to this product tree   If 17 Ps are needed, and no on-hand inventory exists for any items, how many Cs will be needed? If 17 Ps are needed, and no on-hand inventory exists for any items, how many Cs will be needed?

(Multiple Choice)
4.8/5
(41)

Which is true of a net-change system?

(Multiple Choice)
4.9/5
(26)

An effort to expand the scope of material planning by involving other functional areas in the planning process has been

(Multiple Choice)
4.9/5
(27)

The bill of materials contains information on lead times and current inventory position on every component required to produce the end item.

(True/False)
5.0/5
(38)

Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand   Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs. If the firm is using a fixed-period lot size of two periods, what is the order size for the first order? Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs. If the firm is using a fixed-period lot size of two periods, what is the order size for the first order?

(Multiple Choice)
4.8/5
(40)

Safety time is sometimes used in MRP rather than safety stock quantities.

(True/False)
4.8/5
(26)

Refer to this product tree Refer to this product tree   If 24 Ys are needed, and no on-hand inventory exists for any items, how many Rs will be needed? If 24 Ys are needed, and no on-hand inventory exists for any items, how many Rs will be needed?

(Multiple Choice)
4.9/5
(34)

Capacity requirements planning is an important feature in MRP.

(True/False)
4.7/5
(34)

Which one of the following is not an input in an MRP system?

(Multiple Choice)
4.7/5
(28)

Which of these items would be most likely to have dependent demand?

(Multiple Choice)
4.8/5
(25)

A regenerative MRP system is one that is updated continuously, every time there is a schedule change.

(True/False)
4.8/5
(31)

Refer to this product tree Refer to this product tree   If 40 Ps are needed, and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies, how many Cs are needed? If 40 Ps are needed, and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies, how many Cs are needed?

(Multiple Choice)
4.8/5
(36)

Which one of the following most closely describes net requirements for the current period?

(Multiple Choice)
4.8/5
(32)

Low-level coding represents items less than $18 per unit.

(True/False)
4.8/5
(38)

A computer-based information system designed to handle ordering and scheduling of dependent-demand items is used for

(Multiple Choice)
4.8/5
(30)

Scheduled receipts differ from planned receipts in that scheduled receipts

(Multiple Choice)
4.8/5
(30)

In MRP, under lot-for-lot ordering, planned-order receipts are

(Multiple Choice)
4.9/5
(29)
Showing 1 - 20 of 85