Exam 13: MRP and ERP
Exam 1: Introduction to Operations Management78 Questions
Exam 2: Competitiveness, Strategy, and Productivity75 Questions
Exam 3: Forecasting144 Questions
Exam 4: Product and Service Design100 Questions
Exam 5: Strategic Capacity Planning for Products and Services210 Questions
Exam 6: Process Selection and Facility Layout137 Questions
Exam 7: Work Design and Measurement200 Questions
Exam 8: Location Planning and Analysis65 Questions
Exam 9: Management of Quality101 Questions
Exam 10: Quality Control117 Questions
Exam 11: Aggregate Planning and Master Scheduling80 Questions
Exam 12: Inventory Management134 Questions
Exam 13: MRP and ERP85 Questions
Exam 14: Jit and Lean Operations126 Questions
Exam 15: Supply Chain Management91 Questions
Exam 16: Scheduling102 Questions
Exam 17: Project Management118 Questions
Exam 18: Management of Waiting Lines68 Questions
Exam 19: Linear Programming98 Questions
Select questions type
The term pegging refers to identifying the parent items that have generated a given set of material requirements for a part or subassembly.
Free
(True/False)
4.7/5
(33)
Correct Answer:
True
The MRP input stating which end items are to be produced, when they are needed, and what quantities are needed, is the
Free
(Multiple Choice)
4.9/5
(34)
Correct Answer:
A
Refer to this product tree
If 17 Ps are needed, and no on-hand inventory exists for any items, how many Cs will be needed?

(Multiple Choice)
4.8/5
(41)
An effort to expand the scope of material planning by involving other functional areas in the planning process has been
(Multiple Choice)
4.9/5
(27)
The bill of materials contains information on lead times and current inventory position on every component required to produce the end item.
(True/False)
5.0/5
(38)
Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot), and quantities on hand
Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs.
If the firm is using a fixed-period lot size of two periods, what is the order size for the first order?

(Multiple Choice)
4.8/5
(40)
Safety time is sometimes used in MRP rather than safety stock quantities.
(True/False)
4.8/5
(26)
Refer to this product tree
If 24 Ys are needed, and no on-hand inventory exists for any items, how many Rs will be needed?

(Multiple Choice)
4.9/5
(34)
Which one of the following is not an input in an MRP system?
(Multiple Choice)
4.7/5
(28)
Which of these items would be most likely to have dependent demand?
(Multiple Choice)
4.8/5
(25)
A regenerative MRP system is one that is updated continuously, every time there is a schedule change.
(True/False)
4.8/5
(31)
Refer to this product tree
If 40 Ps are needed, and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies, how many Cs are needed?

(Multiple Choice)
4.8/5
(36)
Which one of the following most closely describes net requirements for the current period?
(Multiple Choice)
4.8/5
(32)
A computer-based information system designed to handle ordering and scheduling of dependent-demand items is used for
(Multiple Choice)
4.8/5
(30)
Scheduled receipts differ from planned receipts in that scheduled receipts
(Multiple Choice)
4.8/5
(30)
In MRP, under lot-for-lot ordering, planned-order receipts are
(Multiple Choice)
4.9/5
(29)
Showing 1 - 20 of 85
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)