Exam 10: Quality Control
Exam 1: Introduction to Operations Management78 Questions
Exam 2: Competitiveness, Strategy, and Productivity75 Questions
Exam 3: Forecasting144 Questions
Exam 4: Product and Service Design100 Questions
Exam 5: Strategic Capacity Planning for Products and Services210 Questions
Exam 6: Process Selection and Facility Layout137 Questions
Exam 7: Work Design and Measurement200 Questions
Exam 8: Location Planning and Analysis65 Questions
Exam 9: Management of Quality101 Questions
Exam 10: Quality Control117 Questions
Exam 11: Aggregate Planning and Master Scheduling80 Questions
Exam 12: Inventory Management134 Questions
Exam 13: MRP and ERP85 Questions
Exam 14: Jit and Lean Operations126 Questions
Exam 15: Supply Chain Management91 Questions
Exam 16: Scheduling102 Questions
Exam 17: Project Management118 Questions
Exam 18: Management of Waiting Lines68 Questions
Exam 19: Linear Programming98 Questions
Select questions type
When a process is not centered, its capability is measured in a slightly different way. The symbol for this case is Cpk.
Free
(True/False)
4.8/5
(34)
Correct Answer:
True
Range charts and p-charts are both used for variable data.
Free
(True/False)
4.8/5
(30)
Correct Answer:
False
The specification limits for a product are 8 cm and 10 cm. A process that produces the product has a mean of 9.5 cm and a standard deviation of 0.2 cm. What is the process capability, Cpk?
Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
C
A process results in a few defects occurring in each unit of output. Long-run, these defects should be monitored with
(Multiple Choice)
4.9/5
(39)
Statistical process control charts are not really used to fix quality so much as they are used to
(Multiple Choice)
4.9/5
(35)
A control chart used to monitor the number of defects per unit is the
(Multiple Choice)
4.8/5
(38)
Control limits are based on multiples of the process standard deviation.
(True/False)
4.8/5
(24)
The purpose of statistical process control is to ensure that historical output is random.
(True/False)
4.9/5
(32)
Consider the following information
The number of runs above and below the sample median is:

(Multiple Choice)
4.9/5
(32)
Approving the effort that occurs during the production process is known as acceptance sampling.
(True/False)
4.8/5
(37)
A quality analyst wants to construct a control chart for determining whether three machines, all producing the same product, are in control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results
What is the sample mean for machine #1?

(Multiple Choice)
4.7/5
(38)
The traditional view is that the optimum level of inspection occurs when we catch at least 98.6 percent of the defects.
(True/False)
4.9/5
(36)
A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results
What is the standard deviation of the sampling distribution of sample means for whenever service life is in control?

(Multiple Choice)
4.8/5
(39)
If a point on a control chart falls outside one of the control limits, this suggests that the process output is nonrandom and should be investigated.
(True/False)
4.9/5
(27)
Acceptance sampling, when it is used, is used
(I)before production.(II)during production.(III)after production.
(Multiple Choice)
4.8/5
(28)
Attributes need to be measured, whereas variable data can be counted.
(True/False)
4.8/5
(36)
A time-ordered plot of sample statistics is called a(n)_____ chart.
(Multiple Choice)
4.9/5
(43)