Exam 10: Locating the Building

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The ____ lines can be saved, even after the corner stakes are removed for earthwork, by erecting batter boards.

(Multiple Choice)
4.7/5
(41)

Sometimes the the concrete footings are placed in the ____________of the excavation to support the entire weight of the building.

(Multiple Choice)
4.9/5
(39)

Setting up a laser level is very different from setting up a builder's level.

(True/False)
4.8/5
(38)

The size of the footing may be ommitted when the plan is developed for use in several locations.

(True/False)
4.8/5
(35)

The footing may be __________ to accommodate a sloping site.

(Multiple Choice)
4.7/5
(39)
Showing 21 - 25 of 25
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)